Tender result of pull back return conductor system between Sincan and Hasanbey

Catenary System
Catenary System

TCDD 2 Regional Directorate Sincan-hasanbey Intermediate Catenary System Pull Back Transducer Construction Work Tender Result

Turkish State Railways Administration TCDD 2. 2018 company has been awarded 446686 TL with the limit value of 3.927.269,42 / 4.938.367,52 TL and 4 TL cost approx. 4.802.725,00 TL. ELECTRICITY. ELECTRO. INS. TAAH. SINGING. TIC. LTD. ŞTİ.firması wins.

The tender covers the 260000 meter return conductor (LA-180) and other works. The duration of the work is 240 (two hundred forty) calendar days from the place delivery.

 

Be the first to comment

Leave a response

Your email address will not be published.


*