34 Istanbul

3. bridge for giant auction

Giant tender for the bridge: General Directorate of Highways, Turhan, North Marmara Highway Project under the Yavuz Sultan Selim Bridge in the road until the end of this year plans to tender with the BOT model, he said. General Manager of Highways Cahit Turhan, Istanbul [more…]

07 Antalya

Pedestrian overpass at Calli

Pedestrian overpass to Çallı: The Metropolitan Municipality of ANTALYA went to the tender for the construction of a pedestrian overpass on Çallı in the light rail route leading to numerous accidents. Tender for second overpass after Antalya Boulevard 4 on Wednesday December [more…]

34 Istanbul

Marmaray has passed earthquake test

Marmaray has passed the quake test: The earthquake did not affect Marmaray The earthquake of 4,7 earthquake in Marmara Ereğlisi did not affect Marmaray. After the shake, the experts examined the tube passages. There was no negativity in the controls. Project of Marmaray, the first after opening [more…]

34 Istanbul

Kadriye is stolen again

Kadriye plays degenerating again: They have become so pitiful that they are now hoping to learn from the pretender aşa When Haydarpasa Train Station was disabled, three heroine shopkeepers who had been selling there had to move their looms! Also a restaurant [more…]

34 Istanbul

IETT Ring Expeditions Begins in Başakşehir

IETT Ring Expeditions to the Metro in Başakşehir: Otogar-Bağcılar-Başakşehir-Olimpiyatköy Metro Line IETT ring flights from different parts of Başakşehir started. İETT General Directorate's stop work and infrastructure planning due to the infrastructure of the IETT lines began to be missing. Mayor of Başakşehir [more…]

34 Istanbul

The electromagnetic field of Marmaray is clean

The electromagnetic field of Marmaray is clean: The Project of the Century Marmaray's electronic field measurements were alan clean elekt. Information Technology and Communication Authority (BTK), 25 2013 on 13,6 of November, XNUMX covering immersed tube and approach tunnels between Marmaray's Separation Fountain and Kazlıçeşme [more…]

06 Ankara

Ankara-Istanbul High Speed ​​Train

Ankara-Istanbul high-speed train at the last corner: Ankara and Istanbul between the 7 hour to 3 hour to reduce the high-speed train (YHT) line in the Kocaeli section of the work continues at full speed. According to information received, Gebze-Köseköy Rehabilitation Project [more…]

RAILWAYS

First Tram Arrives by Air

The First Tram Arrives by Air: Samsun Metropolitan Municipality's 25 2012 5 on the date of the XNUMX units of the tram to the purchase of the CNR company in the People's Republic of China air is sent by the first train. By sea in mid-November [more…]