The subway tender of the Third Airport is also OK

The subway tender for the Third Airport is also completed: Gayrettepe-3, which will provide access to the Third Airport. The tender for the study-project construction for the Airport Metro Line has been concluded. The line will be 33 kilometers long.

The Minister of Transport, Maritime Affairs and Communications Feridun Bilgin said Gayrettepe-3, which will provide access to Istanbul 3rd Airport and contribute to the solution of the city's traffic problem. He said that the project work for the airport metro line has started. Feridun Bilgin announced that the tender for the survey-project construction of the Gayrettepe-3rd Airport metro line, which was undertaken by the Ministry, was concluded on July 27.

SHORT TRANSPORTATION

Emphasizing that the project is a very important step for the transportation to the 3rd Airport, Bilgin said, “This rail system will be a project that provides fast access to the 3rd Airport and brings Istanbulites to the airport from the central points of the city in a very short time”. Gayrettepe-3. Stating that the airport line will be approximately 33 kilometers long, Bilgin noted that the transportation between the two points will be provided in 26 minutes.

CONSTRUCTION TENDER AT 2016

Informing that fast metro vehicles reaching a speed of 120 kilometers per hour will be used on the said metro line, Bilgin said that the 3rd Airport-Gayrettepe subway line will be integrated with other metro lines in Istanbul when it is completed and in a very short time from Istanbul's European and Asian sides to the 3rd Airport. expressed that it will be reached. It is planned that the study-project construction work will be completed within a maximum of 1 year, and the construction tender for the line in question will be launched in 2016.

The greenest airport

  • The world's largest airport under construction in Istanbul is being built on a total area of ​​3 thousand 500 hectares.
  • The flight paths are built to minimize sound.
  • It is designed in an aerodynamic way to minimize the speed of the wind.
  • The terminal building will be designed as a green building.
  • The building will be a 'smart building' that uses maximum electricity to minimize the use of electricity.
  • Electricity and heating will be met by central heating and power using the airport's garbage.

There will be six tracks.

  • The third airport has a total of 3,5 runways, 4 runways parallel to the Black Sea and 4 runways running perpendicular to the Black Sea, 2-6 km long suitable for landing and taking off of large aircraft.

Seen from space

  • There will be a shopping facility, 5 star hotels, commercial office buildings, a trade fair area.
  • A special 'economic zone' will be established.
  • Flight routes will be positioned to prevent flying over the city.
  • In the construction of 100 will create employment for a thousand people.
  • The airport can be seen from space in a distinctive way.

Be the first to comment

Leave a response

Your email address will not be published.


*