GENERAL

Handling by the Transportation System in Turkey

Handling by the Transportation System in Turkey: Between 1928-2012 years, netto In transport, the maximum average annual increase in the proportion 1933:1943% between the years 18.53-2001, the maximum reduction while the median growth rate to occur ratio 22.47:4.59% in XNUMX to XNUMX:XNUMX% [more…]

GENERAL

Level Crossing Accidents on History

Level Crossing Accidents Becoming History: If the regulation regulating the measures to be taken and the principles of application in railway level crossings is implemented, level crossing accidents that cause loss of life and property will become history. Railway Construction and Operation Personnel Aid and [more…]

06 Ankara

Speed ​​Train questions from Hope Rate

Umut Orandan High Speed ​​Train questions: CHP Istanbul Deputy Umut Oran asked the Ministry of Transport to explain how it would be possible for Ankara-Istanbul High Speed ​​Train to catch up to the October 29 Republic Day, due to the fact that it was February 2014 in some contracts related to the line. [more…]

tcdd passenger transport map 3
RAILWAYS

TCDD Passenger Transport Map

Shuttle TCDD Map: average rail share is around 2% of railway lines is used throughout the passenger transportation market Turkey active in 45 yl. Considering certain medium and long tracks, the railroad's [more…]

34 Istanbul

YHT Security Questions

YHT Security Questions: If the contract expires in February 2014, how will it catch up to October 29? "Will the traffic control operations reach October 29 or will the outdated TMİ system be used?" "Sirkeci-Halkalı suburb without being removed, Halkalı-Bakırköy, Bakirkoy-like Yedikule could not be stepped? -B [more…]

34 Istanbul

Halkalı - Çerkezköy The Inter-Station Electrification Project, evaluating the objection of the E + M - Aykon Elektrik joint venture, decided to take corrective action in the tender.

TCDD Halkalı - Çerkezköy The Inter-Station Electrification Project, evaluating the objection of E + M - Aykon Elektrik joint venture, decided to take corrective action in the tender, which will be carried out by the General Directorate of Turkish State Railways (TCDD), "Halkalı - [more…]

TENDER RESULTS

Özkaya Construction firm won the tender for the construction of Torbalı Kuşçuburnu Station

Özkaya İnşaat won the tender for the construction of Torbalı Kuşçuburnu Station. The tender for the construction of Kuşçuburnu Station within the scope of the Izmir Suburban System Development Project, whose bids were collected on July 26, 2013 by the Izmir Metropolitan Municipality, was concluded. According to the information received by the Investments Magazine, [more…]

34 Istanbul

Istanbul - Demirköprü Line Project Halkalı - A contract was signed with the company that won the tender for the preparation of application projects for 4 lines between Ispartakule stations.

TCDD Region 1 Istanbul - Demirköprü Line Project Halkalı - A contract was signed with the company that won the tender for the preparation of application projects for 4 lines between Ispartakule stations, by the 1st Regional Directorate of Turkish State Railways (TCDD) 11 June [more…]

Related Articles and Advertisements