Haliç Metro Pass Bridge Opens Tomorrow

Golden Horn Metro Crossing Bridge Opens Tomorrow: Turkey's first metro bridge crossing the Golden Horn Metro Crossing Bridge, a trial run and then entering service on Saturday, February 15, 2014 the final touches. With the bridge, the journey between Yenikapı and Taksim will take 7.5 minutes, and the journey between Yenikapı-4.Levent will decrease to 18 minutes.
The bridge, which began to be built on January 200, 2, on average 2009 meters south of the current Unkapanı Bridge, was built with the “curved cable-stayed” system applied in advanced technological bridges around the world.
The journey between Yenikapı and Taksim with the opening of the bridge will be at the 7.5 minute, and the journey between Yenikapı-4.Levent will fall to the 18 minute.
With the opening of Yenikapı-Aksaray sections, from Yenikapı Kadıköy- Uninterrupted transportation will be provided to the direction of the eagle. When the Aksaray-Yenikapı Metro connection is completed, the journey from Yenikapı to the Bus Station will be 14.5 minutes, Atatürk Airport 36 minutes, and 39 minutes to the Olympic Stadium.
UNINTERRUPTED YENİKAPI
Passengers taking the metro from Hacıosman will reach the Yenikapı transfer station without interruption. Passengers, with Marmaray connection Kadıköy They will be able to reach Kartal by transferring to Ayrılıkçeşme and from here to the metro.
Pedestrian crossings will be free from the bridge, which also has an observation deck. 1 million people are expected to cross the bridge, which is expected to contribute significantly to the solution of Istanbul's traffic problem.
Each of these piles designed as a result of the analyzes made by taking into account the seismicity, faulting condition, ground conditions of the Golden Horn base mud layer was designed according to the final load value of 4 tons.

Be the first to comment

Leave a response

Your email address will not be published.


*