The JCC rejects the appeal for the result of the Afyonkarahisar - Uşak Section and Afyonkarahisar Pole Transition Project tender

The JCC rejects the appeal for the result of the Afyonkarahisar - Uşak Section and Afyonkarahisar Pole Transition Project tender

The Afyonkarahisar - Uşak (Banaz) Section (Between Km 30 + 2015 -Km: 2014 + 5219) and Afyonkarahisar Pole Crossing within the scope of Ankara - Izmir High Speed ​​Train Project numbered 194/325, whose bids were collected by the General Directorate of Turkish State Railways on 268 September 000 In the Infrastructure Construction Construction Work tender, the JCC rejected the objection of Nurol İnşaat - Teyda İnşaat joint venture for the result of the tender. At this stage, the decision of the JCC will be expected to reach TCDD.

As it is known, Şenbay Madencilik-Aga Enerji joint venture, whose objection was rejected by the KİK before, applied to the court and filed the lawsuit. kazanhad been. The court also suspended the execution of the JCC decision. At this stage, the JCC examined the objection on the merits and decided to prequalify the joint venture in accordance with the court decision. However, the tender, with an approximate cost of 1.254.624.003 TL, was a joint venture between Doğuş Construction and Tekfen Construction with an offer of 878.999.998 TL. kazanhad been. The tender may be canceled because the bids have been opened. The matter will become clear in the coming days.

Similar Ads

Be the first to comment

Comments