Tunç Soyer Conducted Its First Site Survey on Narlıdere Subway

tunc soyer performed the first lathe inspection at narlidere subway
tunc soyer performed the first lathe inspection at narlidere subway

Izmir Metropolitan Municipality Mayor Tunç Soyer started the site inspections with Narlıdere Metro. The first concrete shot of the Narlıdere Metro, which is being constructed in seven stations and on two shear shafts, was also accompanied by President Soyer.

İzmir Mayor Tunç Soyer started construction site inspections with Narlıdere Metro. Mayor Soyer went to the construction site of F. Altay-Narlıdere Metro which was tendered to 1 billion 27 million TL which was laid last June. During the examination, Mayor Fatma Çalkaya, Mayor of Narlıdere Ali Engin and Buğra Gökçe, Secretary General of İzmir Metropolitan Municipality were also accompanied by Soyer. Mayor Tunç Soyer, 2022 will be implemented at the beginning of the year Narlıdere Metro will be completed not only on the line, car stops to be made at the exit of the city will provide relief in traffic, he said. In the second stop of Narlıdere Metro, Çağdaş took the first shot of concrete with Mayor Soyer. The project, which continues thirty meters below the ground, works on seven stations and two shafts. The total length of the tunnel reached 1025 meters.

Thirty meters below the ground

President Tunç Soyer, who visited the construction area thirty meters below the ground, said: r A high-tech study is a unique point where students at the university can come to see what they read in books. In that sense, I think universities have created a great opportunity. Approximately one kilometer of the 7,2 kilometer line, ie one in seven, is complete. It doesn't mean that all of the seventh of this work is over, but at least it means a scale about the excavation. Bu

Will increase the comfort of Izmir

İzmir Metropolitan Municipality Mayor Tunç Soyer said that hay It will provide a relief in urban traffic. With the parking lots to be made to the stall outlets, relaxation will be provided not only on the line but also within the city. It will allow you to leave your vehicle and enter the city by metro. Therefore, it is a study that will increase the comfort of the city, the comfort of the people living in the city, and allow them to travel more comfortably. As of the moment the 2022 person is working, this number will then be released to a thousand 750 people. A very feverish and risky study, however, is a successful and rapidly progressing work. I would like to congratulate all my colleagues, they are doing very successful work. Let them all be entrusted to Allah. Hopefully we will meet with Izmirli terminated on the date we promise. Ş

Excavation started at seven stations

At the end of the construction process planned forty-two months,) deep tunnel kullanılarak will be passed by using 7,2 kilometer line TBM (tunnel boring machine). The line consisting of seven stations will consist of Balçova, Çağdaş, Dokuz Eylül University Hospital, Faculty of Fine Arts (GSF), Narlıdere, Şehitlik and Kaymakamlık stations. Multiple construction activities in these seven stations and two shear shafts continue in full swing.

JavaScript is required for this slide show.

Railway News Search

Be the first to comment

Comments