Xnumx to be built between Poyrazköy and Garipçe in Istanbul. the first sounding of the bridge began.
For the bridge, samples will be taken by 48 separate drilling on the Anatolian and European sides.
3. After the completion of the tender process of the bridge, the first construction works began in Poyrazköy about 2 weeks ago.
In order to perform the ground surveys about the bridge, a sounding had to be done.
In Poyrazköy, the road was used to expand the road and to open new roads before the bridge was built using the forest road.
Source: HaberinVakti
Be the first to comment