North Marmara Motorway Kurtköy-Akyazı Section of the 4. Department Opened



section of the northern marmara motorway kurtkoy akyazi section opened
section of the northern marmara motorway kurtkoy akyazi section opened

North Marmara Motorway Kurtköy-Akyazı section of the 4. President Recep Tayyip ErdoğanMinister of Transport and Infrastructure Cahit Turhanwas made available at the ceremony.

President Erdoğan joined the opening of the section covering the Kurtköy-Liman Junction line and the port connection road of the Northern Marmara Motorway with a live connection while addressing the public at a rally organized by the AK Party at the Izmit National Willpower Square.

Speaking at the opening ceremony, Minister of Transport and Infrastructure Turhan, indicating that they are at the junction of the three highways, the North Marmara Highway at the weekend, again reminded us that the President was opened with the participation of Erdogan.

Turhan reminded that the Izmir-Istanbul Highway had opened the Akhisar and Balıkesir city crossings in March at 17, and said that they carried out the assembly of the 1915 Çanakkale Bridge tower basement foundation shaft yesterday.

Turhan today, the North Marmara Motorway Kurtköy-Akyazi section of the 4. section of the service opened, the following statements were used:

. (Addressed to Erdoğan, who joined the ceremony with a live connection) We take these large projects with a model of build-operate-transfer with the leadership of the political, financial and economic stability of the AK Party governments. As you mentioned at the end of this year, we will complete this project until the eastern intersection of Izmit. I hope next year will be completed until the junction Akyazı. With the launch of the project, international and intercity traffic, especially in the northern Marmara region, will be separated from urban traffic and will be a significant relief in transportation. In

Following the speech of our President Erdoğan, Minister Turhan, Foreign Economic Relations Board (DEİK) President Nail Olpak, Limak Holding Honorary President Nihat Özdemir, Limak Holding Honorary Vice President Sezai Bacaksız, Cengiz Holding Chairman Mehmet Cengiz and his entourage ribbon

Minister Turhan, the opening of the North Marmara Motorway Kurtköy-Akyazi section of the 4. section of the vehicle for some time using the reviews found.

Available step-by-step

With the opening of the section connecting the Kurtköy-Liman Junction line and the port connection road to the Northern Marmara Motorway, the links between the Gebze-Orhangazi-Izmir Motorway and the Northern Marmara Motorway via the Osmangazi Bridge and the Yavuz Sultan Selim Bridge and the Osmangazi Bridge, which serve the transit vehicle traffic. provided.

In the context of the Kurtköy-Akyazi Section Project of the Northern Marmara Motorway, 1,9 billion dollars have been invested so far. Turkey's Istanbul socioeconomically in the case of the most advanced metropolis, economy, culture, attractions, and is an important center in the social sphere therefore has a particularly traffic load on the capacity of the throat passage.

The North Marmara Highway Project, the 398 kilometer, is being implemented in order to ease the city's burden, without having to enter the city traffic, and through the access control, high standard, uninterrupted, safe and comfortable way, the transit of the vehicles from time and fuel.

In the Kurtköy-Akyazi section of the Northern Marmara Motorway, the investment cost of the 476 million-dollar Kurtköy-Liman Junction and the port connection road including the TEM junction, the port connection road and the industrial sites in the Köseler and Demirciler locations were already connected to the motorway.

Istanbul Park Junction and Gebze OSB Junction were also put into service. Thus, the hosting of Turkey's most important organized industrial zone in Kocaeli's Gebze district in the North Marmara Motorway access was provided.

Reduced fuel and depreciation expenses

In addition, Dilovası and the surrounding settlements and industrial sites were connected with each other as well as by motorways. The high traffic in this area was safely and comfortably accessible to the North Marmara Motorway.

While the travel times were shortened by the studies carried out, the exhaust emissions of the vehicles dropped to the environment were reduced, maintenance-operating expenses were saved. With the decrease in fuel and depreciation expenses, a positive value was created for the country's economy.

The project forms the locomotive of Turkey's industry and economy in terms of power rings to surround the Marmara Region Marmara important parts of a completed one.

The North Marmara Motorway aims to provide a comfortable and safe transportation network on the north-south and east-west axis of the region. (UAB)

Ads

High Speed ​​Train News



Be the first to comment

Yorumlar

This site uses Akismet to reduce spam. Learn how your comment is processed.