Steel Bridge Completing 11 April Complex to City Park Completed



April to the city park connects the use of steel
April to the city park connects the use of steel

Sanliurfa Metropolitan Municipality, which is being built by the 11 April Complex and 11 April City Park to connect the steel bridge was connected.

The construction works of the 11 Nisan Complex, which was built in accordance with the Ottoman and Seljuk architecture, were completed. The 11 April Complex, where the Islamic Sciences and Sciences Research Center will be located, was re-assembled and a steel bridge was attached to the 11 April City Park, which was completed.

6 bin 360 square meters in accordance with the Ottoman Seljuk architecture in the complex, namazgah, mahfil floor, courtyard, multi-purpose seminar hall, Koran courses, condolence houses, religious publishing house and library, religious offices, classrooms and training rooms are located.

Thanks to the bridge built, access to the lower floors of the complex will be provided, the installation of the escalator system is continuing. In addition, the entire Sanliurfa stone in the areas within the complex of Ottoman and Seljuk art and embroidery designs are made in accordance with the art.

High Speed ​​Train News



Free Email Subscription

your email adress:




20 / 05 / 2019 for events week

This Week Navigation

loading Events
Sat 25
No Events Found
Sun 26
No Events Found

Be the first to comment

Yorumlar

This site uses Akismet to reduce spam. Learn how your comment is processed.