TUBITAK RUTE Signature for Kagithane Istanbul Airport Metro

TUBITAK RUTE Signature for Kagithane Istanbul Airport Metro
TUBITAK RUTE Signature for Kagithane Istanbul Airport Metro

The opening ceremony of Kağıthane-Istanbul Airport Metro, whose signaling was carried out in cooperation with TÜBİTAK RUTE and ASELSAN, took place with the participation of President Recep Tayyip Erdoğan.

The YERLİSİNYAL-CBTC WSATC system, which is used in the subway and developed by TÜBİTAK RUTE, ensures that the trains are operated safely at the GoA4 level, without a driver, in a safe manner and in a way that provides maximum line capacity. Thanks to this system, which only a few companies in the world can provide, foreign dependency in signaling and renewing our country's metro lines will be eliminated, long project schedules and high costs will be prevented. With the dissemination of our domestic signaling systems in our main lines and metro lines needed in the coming years, an added value of 350 million Euros will be provided to our country.

YERLİSİNYAL-CBTC WSATC system was first commissioned in the Kağıthane - Istanbul Airport section of the Gayrettepe - Istanbul Airport line. The YERLİSİNYAL-CBTC WSATC system, which is applied to the 8 kilometer long metro line with 34 metro stations in total, will be expanded as Gayrettepe - Istanbul Airport - Arnavutköy, the line section to be controlled with three stations to be added in a short time. the relevant line in 2023. HalkalıWith its extension to , the metro line consisting of a total of 66 km and 16 stations will be signaled to allow 120 km / h.

Be the first to comment

Leave a response

Your email address will not be published.


*