Certified rail system response from Türel



Certified Rail System Response from Türel: Antalya Metropolitan Municipality Mayor Menderes Türel refuted the allegations about the cost of the rail system that he had brought to Antalya during the first mayoral term. At the resumption session of the last month's Metropolitan Council meeting, a parliamentary member of the CHP had raised allegations about the 1 Phase Rail System Line between Meydan and Kepezalti.

YALAN WRONG INFORMATION
President Menderes Türel, at the Assembly of the December Assembly held in ASAT, responded to false allegations about misleading the public with official documents from Kayseri Municipality. Türel noted that the rail system line in Kayseri was not made to 120 million liras as claimed, but to 3 million, which is almost 100. President Türel stated that a new false allegation was put forward as the 28 mileage and 28 vehicles were in Kayseri. Eden The 17 in Kayseri is a kilometer and 22 vehicle. The length of the vehicles is 32 meters and the length of the vehicles in Antalya is 36 meters. There are no 2 units underpass intersections in the construction of Kayseri. Considering that 10 million pounds is an intersection, we have met two intersection projects from the rail system budget by spending an extra 20-25 million. "he said. Desperation should be the reason why it is wanted to itch, Bun he said.

Ads

High Speed ​​Train News



Be the first to comment

Yorumlar

This site uses Akismet to reduce spam. Learn how your comment is processed.