İnegöl will move forward in transportation

İnegöl Mayor and People's Alliance Mayoral Candidate Alper Taban, who is preparing to build the new era with vision projects that will move the city forward in every field, announced his projects that will bring the city to a new era in traffic and transportation and offer rational solutions to İnegöl traffic. Traffic Transportation Plan, Northern Ring Road, Alanyurt-Akhisar and the opening of new roads including the underpass from Alanyurt region to the center and the new connection road from Hastanesi Street to Osmanbey Street, alternative public transportation plans, new parking lots, road paving works, pavement works, smart intersection and signaling. İnegöl will experience a serious change and transformation in transportation and traffic in 5 years, with projects including comfortable public transportation, new bicycle paths, park-and-ride system, scooter and bicycle parking areas and central pedestrianization works.

15 KM NORTHERN RING ROAD

Explaining one by one what is planned in the 5-year period in transportation, Mayor Taban said; He listed his traffic and transportation projects as follows: “Our Traffic Transportation Plan; We evaluate it under two headings: Traffic Master Plan and Public Transportation Master Plan. Our priority is the Traffic Master Plan... In this area, issues such as opening new development roads, opening connection roads, expropriations according to traffic capacities, volumes and usage rates, and production of new parking areas are included. Our priority and the issues we attach importance to are alternative solutions. In line with our Traffic Master Plan; Our Northern Ring Road project, which will include 2 bridges and 1 viaduct, covering a total of 15 km in the direction of Kulaca-Şehitler. "We aim to implement our new ring road project, which includes Ankara highway and New İnegöl regions."

CONNECTION WAYS TO 3 CRITICAL POINTS

“Our projects that will unite our Alanyurt region, the center and Akhisar region are also valuable. We have a connection road project that starts from Esentepe junction and reaches Akhisar bridge. We also have a connection road project with a car underpass opposite our Merpa Market place by creating a new road axis from Tuna Boyu Street, which is referred to as the Kozluca region. There is currently a pedestrian underpass in that area. Again, by opening a new connection road on the axis of Adnan Menderes Boulevard, Eski Hastanesi Street and Osmanbey Street, we will divide the flow into Kasımefendi Street and Osmanbey Street. "With our work on these axes, İnegöl traffic will experience serious relief."

150 KM CONSTRUCTION ROAD WILL BE OPENED

“While we will ease the traffic on the main arteries, we will also increase the number of streets and side roads in the center and rural areas. We aim to open a total of 116 km of new development roads in 150 neighborhoods of our city. "In the new era, there will be no planned development roads left unopened in the central neighborhoods."

THERE WILL BE NO ROAD LEFT UNPAVED IN THE RURAL

“The quality of roads is as important as the quantity. Once the infrastructure works are completed, we will focus on road paving works. We aim to carry out a total of 116 thousand m500 of road paving work in 2 neighborhoods. "There will be no unpaved roads in our rural neighborhoods."

SMART INTERSECTION WORKS WILL CONTINUE

“Within the scope of smart intersection and signaling works, we will continue to produce smart solutions to the traffic problem caused by the increasing number of vehicles in coordination with Bursa Metropolitan Municipality. In this context, we will continue our smart intersection and signaling works in various areas of our city.”

BICYCLE ROADS TO BICYCLE CITY İNEGÖL

“We aim to create uninterrupted routes that will strengthen our bicycle path network in accordance with the history of our bicycle city İnegöl. Within the scope of our Transportation Master Plan, we will continue to increase our bicycle routes during this period. “We aim to create bicycle and scooter parking areas in various areas in order to prevent irregular parking caused by the widespread use of bicycles and scooters, which have become widespread recently in İnegöl.”

STEPS TO MAKE THE CENTER PEDESTRIAN

“We want to pedestrianize the center. We aim to carry out pedestrianization works in the center, taking into account the aims of transforming the roads frequently used by our citizens into sustainable walking areas in accordance with the urban identity of our city or creating more spacious areas with various arrangements. Especially within the scope of our short-term practices, we aim to create areas closed to traffic only on weekends in certain locations. “We will carry out all these works in line with the data of our Traffic Master Plan and Public Transportation Master Plan.”

PARK AND GO SYSTEM

“In order to reduce the use of private vehicles in urban travel, we aim to make an exemplary application of the Park and Ride System in our city, which allows journeys to continue in public transportation with car parks created in the center and on the periphery of the center.”