The Final Stage of Singeç Bridge, Awaited by 4 Districts in Tunceli

The Last Stage of Singec Bridge, Where Tunceli Province Awaits
The Final Stage of Singeç Bridge, Awaited by 4 Districts in Tunceli

The construction of the Singeç Bridge, which connects Tunceli's Pertek, Hozat, Ovacık and Çemişgezek districts, has come to an end. The bridge, with a total length of 472 meters, consists of 14 piers and 13 spans.

It has been reported that the construction of the Singeç Bridge, which will facilitate transportation in 4 districts in Tunceli, has come to an end. In the statement made by the governor's office, it was stated that various studies were carried out in order to facilitate transportation in the city.

In this context, it was stated in the statement that the Singeç Bridge was built in Pertek, and the following was noted: “Work on the construction of the 14-footed and 13-span bridge with a total length of 472 meters connecting our Pertek, Hozat, Ovacık and Çemişgezek districts is about to be completed. We would like to express our gratitude to our President, Mr. Recep Tayyip Erdoğan, our Ministry, General Directorate of Highways, 8th Regional Directorate and everyone who contributed to bringing this structure to our city.”

Be the first to comment

Leave a response

Your email address will not be published.


*