Vietnam Invests in 5G Communications Infrastructure for High-Speed ​​Trains

Vietnam Invests in 5G Communications Infrastructure for High-Speed ​​Trains - RaillyNews
Vietnam Invests in 5G Communications Infrastructure for High-Speed ​​Trains - RaillyNews

Vietnam finalizes frequency plan to enable FRMCS and modernize railway communications

Vietnam’s Ministry of Science and Technology has designated specific frequency blocks for railway mobile communications to support the transition from GSM-R to 5G-based FRMCS. The assigned ranges—874.4–880 MHz, 919.4–925 MHz, and 1900–1910 MHz—provide both wide-area coverage and higher-capacity channels that rail operators need for real-time control, signaling redundancy, passenger information, and trainborne telemetry.

Why Vietnam chose both 900 MHz and 1900 MHz bands

The 900 MHz band offers superior propagation and building penetration, reducing the number of base stations on long intercity and high-speed corridors. The 1900 MHz band supplies extra bandwidth for high-throughput services on densely trafficked urban and automated segments. Combining these bands lets operators balance cost, coverage, and capacity: use the 900 MHz layer as the primary control and safety backhaul while allocating 1900 MHz for video, predictive maintenance data streams, and train-to-cloud applications that demand higher data rates.

How the frequency plan aligns with international FRMCS standards

Standards bodies such as UIC, 3GPP and ETSI envisage FRMCS operating across sub-1 GHz and midband ranges. Vietnam’s plan mirrors that multi-band approach, facilitating procurement of interoperable equipment and easing cross-border operations. By selecting bands used in Europe, parts of Asia and Australia for FRMCS trials, Vietnam reduces integration risk for commercial radio units, core network elements, and signaling gateways needed for a phased GSM-R to FRMCS migration.

Practical deployment model: phased, redundant, and vendor-agnostic

Implementations benefit from a phased architecture:

Phase 1 — Coverage backbone: Deploy 900 MHz macro sites along corridors for continuous control-plane connectivity and fall-back signaling. Example: an intercity route with 200 km spacing between reinforced towers reduces site count and operational cost while preserving availability targets.

Phase 2 — Capacity layer: Overlay 1900 MHz small cells in stations, yards and automated urban lines to serve passenger Wi-Fi offload, HD CCTV backhaul, onboard diagnostics and telemetry. Example: a suburban commuter corridor with high passenger density adds 1900 MHz cells every 1–2 km to support video analytics and real-time passenger-counting systems.

Phase 3 — Core and edge services: Integrate FRMCS radio units with virtualized core network functions (vEPC/vNFs), edge compute nodes for low-latency train control applications, and unified OSS/BSS for spectrum and device management. Implement dual-radio handsets and onboard gateways that can attach to either band to preserve session continuity during handovers or when one band degrades.

Local production and ecosystem development: steps Vietnam can take

Vietnam targets domestic capability in FRMCS equipment and core systems. A practical roadmap includes:

1) Certification and reference platform: Publish a national interoperability specification adopting ETSI/3GPP FRMCS profiles. Provide a certified reference stack so local firms can test radio firmware and core interfaces without full-scale field trials.

2) Joint R&D and pilot programs: Fund consortia of domestic manufacturers, universities and foreign vendors to build small-scale pilots on commuter lines—validate handover behavior, mission-critical push-to-talk, and low-latency signaling under mixed-band operation.

3) Manufacturing incentives: Offer tax credits or procurement preferences for radios, gateways and edge compute nodes assembled domestically; incentivize technology transfer clauses in supplier contracts.

Operational use cases enabled by dual-band FRMCS

Detailed examples demonstrate measurable gains:

Safety and signalling resilience: Use 900 MHz as the primary safety-critical control channel and reserve 1900 MHz for encrypted telemetry bursts and fallback communications during maintenance windows.

Predictive maintenance: Stream continuous sensor telemetry (vibration, wheelset temp, bearing health) over 1900 MHz to centralized analysis. A fleet of 50 trains reporting 500 parameters at 1 Hz can require several Mbps per train during peak diagnostics; midband capacity avoids congestion that would otherwise delay fault detection.

Passenger services and operations: Deliver station-side HD video analytics on 1900 MHz to automatic crowd management; push delay notifications and multimodal journey updates using control-plane messaging on 900 MHz to preserve reliability under load.

Regulatory and allocation details that matter to operators

Vietnam’s regulation restricts the designated bands to railway control, safety and operational communications rather than public terrestrial mobile services. Operators should prepare for:

Licensing model: Expect concession-style spectrum assignments tied to specific railway corridors or operator concessions, including coordination obligations for cross-border lines.

Interference management: Implement strict out-of-band emission controls and guard bands, especially near existing mobile networks. Operators should map neighboring allocations, run drive tests, and deploy dynamic spectrum monitoring to detect and mitigate interference.

How this frequency plan impacts high-speed rail feasibility and project timelines

The Ministry of Construction aims to complete consultant selection for the high-speed rail feasibility study in Q4 2026. The new spectrum plan reduces technical uncertainty for that study: consultants can size communications architecture, forecast CAPEX/OPEX for radio sites, and model signaling redundancy costs with concrete band characteristics. That clarity shortens procurement cycles for radio access networks and supports earlier vendor prequalification for FRMCS-capable equipment.

Examples from the region that inform Vietnam’s approach

Australia and Thailand have moved toward using 1900 MHz for FRMCS trials; Malaysia allocated specific urban transit frequencies in Sarawak. Lessons to adopt:

Interoperability testing: Run cross-vendor labs before live trials to reduce field integration risk.

Shared infrastructure: Where corridor density is low, negotiate shared mast and fiber backhaul agreements between public and private rail operators to lower build cost.

Checklist for rail operators preparing for FRMCS deployment

Operators can follow this practical checklist to accelerate rollout:

Technical: inventory legacy GSM-R assets, map coverage gaps, specify dual-band radios, design edge compute topology.

Commercial: build procurement lots for phased rollout, require software-defined radios and open interfaces, include local content targets.

Regulatory: obtain spectrum assignments for corridors, file cross-border coordination plans, secure EMC and type approvals for rail radios.

Expected benefits and measurable KPIs

Trackable KPIs include: control-plane latency (target <50 ms for critical signaling), packet loss (<0.1% for safety messages), mean time to detect failures (improve by 30–50% with predictive telemetry), and total cost of ownership (TCO) per km (expected reduction via 900 MHz coverage and shared infrastructure). Operators should publish baseline metrics pre-rollout and measure quarterly during phased deployment.

Conclusion: a balanced spectrum strategy for resilient, high-capacity rail networks

By formalizing 900 MHz and 1900 MHz allocations for rail use, Vietnam creates a predictable regulatory environment that supports both broad coverage and high-capacity services. Combining these bands in a layered FRMCS deployment enables reliable safety communications and scalable data services, while domestic production incentives and phased pilots reduce integration risk and strengthen local industry. The approach positions Vietnam among a small set of countries planning simultaneous use of both bands specifically for railway FRMCS, helping future-proof upcoming high-speed and urban rail projects.

Vietnam Invests in 5G Communications Infrastructure for High-Speed ​​Trains - RaillyNews
ASIA

Vietnam Invests in 5G Communications Infrastructure for High-Speed ​​Trains

Vietnam finalizes frequency plan to enable FRMCS and modernize railway communications Vietnam’s Ministry of Science and Technology has designated specific frequency blocks for railway mobile communications to support the transition from GSM-R to 5G-based FRMCS. The assigned ranges—874.4–880 MHz, 919.4–925 MHz, and 1900–1910 MHz—provide both wide-area coverage and higher-capacity channels 🚄
No Picture
EUROPE

Virgin Reveals First Images of New Train Set to Rival Eurostar

Virgin to launch high-speed international rail service connecting London with Paris, Brussels and Amsterdam Virgin announced a fleet of new high-speed trains designed to run across the English Channel corridors, scheduled to enter service from 2030. The trains, painted in a distinctive black-and-red livery, will aim to provide up to 🚄
No Picture
Turkiye

Ankara Child Council Announces 31st Term Leadership

Nilsu Ergün Elected 31st Term President Nilsu Ergün won the election and was officially appointed as the 31st Term President of the Ankara Metropolitan Municipality Children’s Assembly. The handover ceremony included the presentation of a presidential badge and bouquet by outgoing president Yaman Akman. The new leadership team will drive 🚄
Two-Phase Testing for Local Regulations on Rail-Connected Facilities by STB - RaillyNews
AMERICA

Two-Phase Testing for Local Regulations on Rail-Connected Facilities by STB

STB’s clarified two‑question framework and why it matters now The Surface Transportation Board (STB) published a nonbinding policy statement that asks two concrete questions to decide whether state or local rules aimed at rail‑connected terminals fall under federal preemption under the Interstate Commerce Commission Termination Act (ICCTA). The statement uses 🚄
Wabtec and Transnet Sign $390M Locomotive Support Agreement - RaillyNews
AFRICA

Wabtec and Transnet Sign $390M Locomotive Support Agreement

Wabtec signs long-term support agreement with Transnet Wabtec finalized a long-term support agreement with state-owned Transnet to boost the operational reliability of its 43D (C30ACi) and 44D (ES40ACi) diesel locomotive fleets. The contract—announced by Transnet Engineering on 15 October and valued by Wabtec at roughly $390 million—covers spare parts supply, 🚄
$51.5 Million Branch Line Contract Signed for Metrolink - RaillyNews
AMERICA

$51.5 Million Branch Line Contract Signed for Metrolink

Granite Construction wins $51.5M contract and sets a clear delivery window Granite Construction secured a $51.5 million contract to extend the Marengo and Rancho Cucamonga sidings on Metrolink’s San Bernardino Line. Work is scheduled to begin in January 2027 and to finish in July 2028, aligning completion with the LA28 🚄
Northern Awards £100 Million ETCS Simulator Contract to SIM Factor - RaillyNews
EUROPE

Northern Awards £100 Million ETCS Simulator Contract to SIM Factor

Overview of the contract and timeline Northern has awarded a multi-year framework contract to SIM Factor to deliver ETCS cabin and portable simulators and training infrastructure to re-skill roughly 1,800 drivers across northern England. The agreement, advertised in early November, covers an eight-year framework with a notional value of about 🚄
No Picture
EUROPE

Network Rail Expands Its Exclusive Track Cleaning Technology

Why Network Rail Is Expanding Interflon Leaf Guard Network Rail expanded the Interflon Leaf Guard trial from the Conwy Valley to the North Wales Coast to eliminate autumn leaf-related wheel-rail adhesion failures that previously caused long delays. After a focused trial between Tal-y-Cafn and Blaenau Ffestiniog delivered zero leaf-caused adhesion 🚄
Amtrak Updates Its Firearm-Carrying Policy - RaillyNews
AMERICA

Amtrak Updates Its Firearm-Carrying Policy

What Amtrak is changing and when it will take effect Amtrak plans to let adult passengers carry unloaded, declared firearms in locked, hard-sided cases inside passenger cars on certain routes starting in phases through 2027. The company already allows firearms in checked (registered) baggage and uses a different Auto Train 🚄
London Underground Drivers to Stage Eight Strikes - RaillyNews
EUROPE

London Underground Drivers to Stage Eight Strikes

Strike schedule and immediate passenger impact The RMT union will run eight separate 24‑hour strikes between 26 November 2026 and 26 February 2027. Each stoppage begins at 12:00 and ends 24 hours later, which means services on the start and end dates will face major disruption for full daytime service 🚄

Be the first to comment

Leave a Reply