Eryaman Traffic Relaxes: Istanbul Road Connection Junction is Being Built!

Ankara Metropolitan Municipality will build a 8-lane bridge junction after the entrance gate on Istanbul Road and a 4-lane valley bridge to and from the Göksu side for the Istanbul Road Eryaman connection junction.

In order to solve the traffic problem between Göksu and Susuz Neighborhoods, Ankara Metropolitan Municipality (ABB) will start the construction of an interchange and a valley bridge with a tender price of 324 billion 645 million.

For the Istanbul Road Eryaman connection junction, the construction of an 8-lane, bridge junction after the entrance gate on the Istanbul Road and a 4-lane valley bridge to and from the Göksu side is starting.

As of April 25, two lanes will be provided on the Ankara-Istanbul direction of Fatih Sultan Boulevard. The Istanbul-Ankara arrival direction will remain closed during the project.