Melet Adds Color to Ordu With Its Shining Appearance

Melet Adds Color to Ordu With Its Shining Appearance
Melet Adds Color to Ordu With Its Shining Appearance

Ordu Metropolitan Municipality Mayor Dr. Mehmet Hilmi Güler's efforts to change and transform Ordu continue. The Büyük Melet Project, the construction of which started last year within the framework of these studies, gave Altınordu a brand new look. The second phase of the project, whose 1st phase has been completed and has gained a modern look, has also been completed. Thus, a new living space was brought to Ordu. Melet, which shines brightly with the completion of the lighting in the area that appeals to all segments of the society, also added color to Ordu with its appearance.

With the project enriched with walking paths, green areas, parks, a marina where boats and ships can dock, and islets, Melet gets rid of its idle appearance and becomes a perfect life center. Metropolitan Mayor Dr. The project, which Mehmet Hilmi Güler attaches special importance to, is put into service in stages.

'MELET 2 PARK' IS DELICIOUS

Ordu Metropolitan Municipality, which completed the first stage of the project, which was implemented in the area between the Black Sea Coastal Road and the alternative Melet Bridge built to the ring road, has now completed its works on the 2-decare area between the Melet River and the Organized Industrial Zone under the name of 'Melet 30 Park' and put it into use. The area, where many works from bicycle and walking paths to a multi-purpose sports field, from urban furniture to landscaping took place, became the new living space of Altınordu. After the works such as a prayer room, buffet, cafeteria and orchard, the lights came on in Melet, with the completion of the lighting works. The area viewed from the air suited the Army very well.

MADE WITH MUNICIPAL FACILITIES

Landscape works, lighting, irrigation works, architectural structures and urban equipment elements of the project were carried out in the Parks and Green Areas Department's own workshop and with its own personnel. With this study, the project was completed more economically and faster.

MELET'S FIRST STAGE ATTRACTED INTENSE ATTENTION

Ordu Metropolitan Municipality completed an area of ​​7 thousand 559 square meters in the first stage and opened it for use. Within the scope of the works carried out, 1.253 square meters of walking path, 5 square meters of green space, 740 square meters of children's playground and multi-purpose sports field, 193 meters of wooden railings, 445 camellias and 12 picnic tables, 10 1 square meters of cultural grass and 260 The Metropolitan Municipality, which built WCs (male, female and disabled), gave the region a new identity.