Between Istanbul and Lüleburgaz will be reduced to 45 minutes by high-speed train

Between Istanbul and Lüleburgaz will be reduced to 45 minutes by high-speed train
Between Istanbul and Lüleburgaz will be reduced to 45 minutes by high-speed train

Kırklareli Governor Bilgin, Halkalı Regarding the Kapıkule Railway Project, “The journey to Istanbul by train takes a very long time, about 4-5 hours, sometimes even 6 hours. With the project, transportation from Istanbul to Lüleburgaz will be provided in 45 minutes.” said.

Kırklareli Governor Osman Bilgin, the largest transportation project in the region Halkalı-Kapikule Railway Line High Speed ​​​​Train Project ÇerkezköyHe met with the press representatives in Kırklareli at the Governor's Office regarding the ongoing works at Büyükkarışan-Lüleburgaz-Babaeski stations, located within the borders of Kırklareli on the Kapıkule railway line, and made statements.

Governor Bilgin, in his statement; Çerkezköy-The Kapikule line is planned to be completed on October 2023, Republic Day of 29, that is, on the 100th anniversary of our Republic. I hope it will be a gift for the 100th anniversary of our Republic," he said. He stated that with the ongoing works in our province, the rail of the 15-kilometer high-speed train line has been laid. It is a very important project for our city. He said that with the project, transportation from Istanbul to Lüleburgaz will be provided in 45 minutes.

Governor Bilgin further stated that they have made an investment of 20 million in Kırklareli within the scope of the protocol they signed with the company that continues the project. Stating that within the scope of the project, pasture improvement works were carried out in an area of ​​4 decares, he said, "We provide our villagers with the cultivation of barley, oats and vetch as fodder crops here and distribute them as well. In addition, sheep and goats benefit from the pasture. He said that they have made a protocol that the company will meet all the needs in all road infrastructures, water infrastructures, sewerage infrastructure and similar areas damaged during the work.

Apart from this protocol, with the studies carried out by the Kolin company in Kırklareli;

  • Traffic Training Park
  • Pancarköy Village Park Arrangement
  • Financial Support of 520.000 TL to be Used After the Flood Disaster in Alpullu Town
  • Büyükmandıra Town Entrance Bridge Construction
  • Financial Support of 100.000 TL to the Association to be Used After the Kastamonu Flood Disaster
  • 6.500 Tons Type A Gravel
  • 10.000 Tons of Asphalt Base Materials were supplied…

In addition;

  • 450 Tons of Bitumen Supply (AC100/150)
  • 250 Tons of Bituminous Binder Supply (MC 30)
  • 10.000 Tons Type A Gravel
  • 75.000 Tons of Asphalt Base Material
  • 200.000 Liters of Diesel
  • 18.000 m2 Paving Stone
  • Survey, Restitution and Reconstruction Application works of Erenler Tomb will be carried out…

Be the first to comment

Leave a response

Your email address will not be published.


*