the damage of tcdd is astounding billion
06 Ankara

The Loss of TCDD Makes Lip Blows! 11,4 Billion

TCDD administration also broke a record loss in state institutions. State Railways of the Republic of Turkey was detected in four years has exceeded 11 billion 174 million pounds. In addition, it was revealed that the institution was damaged by renting 1250 real estates for cookie money. From SÖZCÜ [more…]

tekirdagin muratli district in two bolen railway was laid on the table
59 Tekirdag

Muratli District of Tekirdag Railway Splitting

The Railway Dividing Tekirdağ's Muratlı District In Two, Layed On The Table; With the wire fences drawn around the railroad that passes through the middle of Tekirdağ's Muratlı district and divides the district into two, a remedy is sought for the victims. Muratlı District Governorship Meeting Hall [more…]

TCDD General Evaluation and Consultation Started
34 Istanbul

TCDD General Evaluation and Consultation Workshop Started

TCDD General Evaluation and Consultation Workshop Started; “General Evaluation and Consultation Workshop” at TCDD Fenerbahçe Training and Listening Facility started under the chairmanship of TCDD General Manager Ali İhsan Uygun. The Republic of Turkey State Railways (TCDD), the activities carried out by [more…]

corlu train crash new development
59 Corlu

25 New Development in Çorlu Train Wreck

25 in Çorlu is one of the defendants of the train accident, TCDD 1. Regional Directorate Halkalı 14. Railway Maintenance Directorate Railway Maintenance Manager Turgut Kurt wrote to the institution two years before the disaster, "navigation safety, occupational health and road [more…]

from the governor's office
54 Sakarya

Description of Valilikten Gar Market

The Governorship made a statement regarding the market place established in Adapazarı Train Station and caused a great reaction. “In some press organs published in our city; “The reaction to the Station Market is growing. That's how it was inspected ”,“ Governor Nayir, Gar [more…]

11 Bilecik

Yenişehir-Osmaneli YHT Project in the Tender Stage

Yenişehir-Osmaneli YHT Project in the Tender Stage: Bilecik Provincial Coordination Board Meeting was held under the chairmanship of Bilecik Governor Tahir Büyükakın. At the meeting held at the Provincial General Assembly Meeting Hall, Governor Büyükakın stated that many projects took place in Bilecik and in 2017. [more…]

34 Istanbul

Çerkezköy- The fate of the train trip

Çerkezköy-The fate of the train trip to the CanalÇerkezköy-Sirkeci In order to introduce train services, Çerkezköy With Protocol Çerkezköy Various visits were made on the train ride with the governor Metin Kubilay and his entourage. Çerkezköy Halkalı TCDD at the promotional tour of the train [more…]

34 Istanbul

Training of Line Warning System in TCDD 1.

Line Warning System Training was given in TCDD 1st Region: “Line Warning System Training” was given to the personnel working on the line in TCDD 1st Regional Directorate. In Fenerbahçe Education and Recreation Facilities of TCDD 1st Regional Directorate, Sakarya University lecturer Assoc. Dr. Hakan Guler [more…]

22 Edirne

Awareness Study for Level Crossings in TCDD 1.

Awareness Study for Level Crossings was carried out in TCDD 1st Region: “Awareness Study for Highway Drivers at Level Crossings” was conducted in TCDD 1st Regional Directorate. In the Thrace part of TCDD 1st Regional Directorate, Ispartakule, Velimeşe, Muratlı, Edirne, Apullu, Lüleburgaz and Çerkezköyfound in "Level Crossing [more…]

06 Ankara

Safety Management System Training Started at TCDD

Safety Management System Training Started at TCDD: Within the scope of the activities for the adoption of the Safety Management System, TCDD 1st Regional Directorate personnel are trained between 08-12 February 2016. TCDD General Directorate Safety Management System in Infrastructure and Train Management [more…]