Transportation to Istanbul New Airport Will Be Very Easy

Access to the new airport will be very easy with both metro and land. Many projects are planned to be made in parallel to the new airport. We have discussed all the innovations in this field.

Transportation to the new airport by public transport will be very easy. Now it is very easy to reach the airports in Istanbul as well as transportation by metro. In Istanbul, where traffic becomes irresistible, journeys by metro are much more preferred. There is a special metro for those going to Ataturk Airport, but we cannot say the same thing for Sabiha Gokcen. In the current projects, it is said that Pendik metro is heading towards the airport, but there is no concrete step. Transportation to the airports by metro is much easier and more economical and it is preferable for tourists coming to the city to use metro. In summer, cool in winter and hot in the hot spots. This means that there is usually no traffic or any work, so the 2 time is usually between pauses as standard. You can then calculate how many minutes you can get off the train. The transportation to the new airport is now considered as a bus, train and metro. As such, the world's largest airport will be 3. Many projects arise within the airport.

TRAIN MOST USED VEHICLE IN THE NEW AIRPORT

One of the most preferred vehicles is the bus which is currently working on the new airport project. After the 4-5 month when the new airport will be opened, the most used public transportation vehicle will of course be the bus. Trains to the airport, which will be able to reach the airport with special services such as ring voyages, private bus lines and taxis, will come much later. The construction of the rails is not completed in Gebze - Halkalı the train station is known to be widely used. The construction of trains to be used at the new airport is currently under construction.

THE METRO TENDER FOR THE 3.CRANTS WAS HELD ON 2016

The details of the metro tender, which was made by the Ministry of Transport, Maritime Affairs and Communications and last year, have become clear. 2 is the 6 that will be performed in stages and will pass through the 3 county. Airport metro line tender resulted. Details about the work will be released very soon. 12 In September, Minister of Transport, Maritime Affairs and Communications Mr. Ahmet Arslan announced that the Decree of the Decree-Law on the Organization and Duties of the Ministry. esinde 15. Airport Rail System Line Survey-Project ett 2014 kilometers long Gayrettepe-New Airport with 3 kilometers long Halkalı-The construction of the planned rail system line as a total of 65 kilometers has started. The first phase of the project, which is determined as the Gayrettepe-New Airport, the EIA Certificate and feasibility studies said that the completion of the work.

NEW AIRPORT SPECIAL METRO LINES IS A FEE

The new metro line to be built exclusively for the new airport consists of a full 6 district. The details of the new metro line that will pass through the 6 district began to take shape. It is known that the transportation from the European side to the metro will be done by bus and the transportation from the Anatolian side will be by bus and train. We are not able to explain the details yet, but when the airport is opened, we will give you all the details. With Gayrettepe-Istanbul New Airport Halkalı-İstanbul New Airport lines will be under the control of the Ministry. Şişli, Kağıthane, Eyüp, Arnavutköy, Başakşehir and Küçükçekmece districts and the people of the metro line to wait for the project cost was determined. The project will be made and will be available for 4 billion 845 million 600 thousand TL.

Source : www.internetajans.net

Be the first to comment

Leave a response

Your email address will not be published.


*