trumpies produced on the road to sanliurfa in may
63 Sanliurfa

The Trambus Produced by Bozankaya in Sanliurfa in May

Sanliurfa Metropolitan Municipality Mayor Nihat Ciftci said that in the last Assembly Meeting he attended during his tenure, Trambus project could not be completed by the company on time due to the increase in the exchange rates but the vehicles would be delivered in May. The project and infrastructure work [more…]

Ads
RAILWAYS

Trambus Roads are paved in Sanliurfa

In the last 5 year, the Metropolitan Municipality, which has implemented the Trambus Project in order to overcome the current transportation problem in Şanlıurfa, with a population increase of 25 per cent, came to an end. The first stage set for the Trambus Project, which is fully supported by the citizens [more…]

RAILWAYS

Trambus Damages the Historical Texture of Urfa

Sanliurfa Metropolitan Municipality is preparing for the opening of the Trambus project will damage the historical texture of the city, indicating that the ŞPO Urfa Branch Chairman Mehmet Selim Açar, instead of cheaper and under the master plan in the framework of the system of havaray said. The Metropolitan Municipality of Şanlıurfa [more…]

RAILWAYS

Sanliurfa Trambus Project Ends

In the last 5 year, Sanliurfa Metropolitan Municipality, which has realized the Trambus Project in order to overcome the current transportation problem in Sanliurfa, which has increased its population by 25 by the end of the year, has come to an end. The first stage for the Trambus Project, which is supported by the citizens [more…]

RAILWAYS

The Trambus Period Begins in Şanlıurfa

Trambus Period starts in Şanlıurfa: The Metropolitan Municipality, which facilitates transportation in Şanlıurfa by making innovations every day in public transportation, increases the quality in public transportation with Trambüs. Speaking in the introduction program Trambus President Farmer: ında most of this system [more…]