choline
34 Istanbul

Kolin Construction Exits from IGA

Kolin Construction has decided to transfer its shares in IGA, the operator of the third airport in Istanbul, in which it is also a partner. Partnership structure at IGA Airport Operation Inc., which realizes the Istanbul New Airport project with the Build-Operate-Transfer model and undertakes the operation for the 25 yearbook [more…]

third airport operator
34 Istanbul

The Third Airport Operator's Law Challenge

Ferit Kaya (2), who was working as a construction machine operator for about 30 years in the airport construction, suffered hearing loss while working at the construction site. Kaya was given a report by doctors that ”cannot work hard”. Young worker dismissed on the grounds that his disease is persistent [more…]

places where the important transportation projects
RAILWAYS

Yertaş Construction Requires Konkordato

Yertaş Construction, which was established in 1975 and signed important metro projects in Ankara and Istanbul, demanded concordat because it could not collect its receivables. SözcüAccording to the news of Bora ERDİN'ın, Dudullu-Bostanci metro line starting at 2016 İçerenköy and Küçükbakkalköy stations [more…]

34 Istanbul

3 from the Competition Board.

Competition Board, Cengiz Construction, Mapa Construction, Limak Construction, Kolin Construction and Kalyon Construction Joint Venture Group Istanbul 3. 4 approved the establishment of a new joint venture group to serve at the Airport. Located on the website of the Competition Board [more…]

06 Ankara

Ankara High Speed ​​Train Station Project

Ankara High Speed ​​Train Station Project is on display: With the construction of a Operational Transfer Model, one of the giant projects of Ankara, the High Speed ​​Train Station Project, will be screened at a press conference. Build Operate Transfer model, Cengiz Construction, Limak Holding and Choline [more…]