General Manager of Highways, Ahmet Gülşen, made investigations in Ankara and Bolu to see the ongoing works under the responsibility of the Ankara 4th Regional Directorate. Visiting the Yenikent-Temelli Road, Çayırhan Bridge and Connection Tunnel construction sites in Ankara, Gülşen then went to Bolu and inspected the Bolu South Ring Road and Bolu-Mudurnu Road, which were brought to the last stage.
The Southern Ring Road project, which was built in the standard of a 2,9-kilometer-long, bituminous hot-mixed divided highway, is a direct route between the D-100 State Road and historical districts such as Göynük, Mudurnu, and settlements in the region, without stopping by the city center of Bolu. will provide transportation.
In the project, a 2,9-kilometer-long, 5-meter-wide, hot-mixed bitumen-coated bicycle and walking path running parallel to the ring road will be available to the people of Bolu.