16 Bursa

High Speed ​​Train in Bilecik

High-speed train was installed in Bilecik, looking for a road in Mezitler: Date 12 December 2012 baş The train of Bursa-Yenişehir phase started with the foundation of the high-speed train for the Bursa Station at Balat, and the project works were continued for the Yenişehir-Bilecik stage. Bride [more…]

GENERAL

Works on the Bay Bridge

Works on the Bay Bridge are in full swing: 4's biggest suspension bridge, which will be located between Yalova Altınova District and Hersek Cape, has reached 50 in the studies on the Bay Bridge. Gebze-Orhangazi- Izmir will download Istanbul-Izmir highway to 3.5 hours [more…]

RAILWAYS

Works on the Bay Bridge

Works on the Bay Bridge are in full swing: The 4 largest suspension bridge of the world, which will be located between Yalova Altınova District and Hersek Cape, has reached 50 in the studies on the Bay Bridge. Gebze-Orhangazi- Izmir will download Istanbul-Izmir highway to 3.5 hours [more…]

RAILWAYS

pay attention to the road in Turkey

In Turkey attention to these ways: making way in some parts of highways controlled transportation is provided due to maintenance and repair work. According to the daily road condition of the General Directorate of Highways, the 22-44 of the İkizdere-İspir road. avalanche [more…]