Light Appeared in the Ayvacık T-2 Tunnel at the Kazdağları Crossing in Çanakkale

Light Appeared in the Ayvacık T-2 Tunnel at the Kazdağları Crossing in Çanakkale
Light Appeared in the Ayvacık T-2 Tunnel at the Kazdağları Crossing in Çanakkale

The excavation works have been completed and the light has been seen in the T-2 Tunnel, which is within the scope of the Ayvacık-Küçükkuyu Road, which will ensure the integrity of the divided road on the route connecting Çanakkale to Balıkesir and İzmir. At the ceremony held on Tuesday, February 1 with the participation of Transport and Infrastructure Minister Adil Karaismailoğlu and General Director of Highways Abdulkadir Uraloğlu, Minister Karaismailoğlu struck the final blow with his heavy machinery and ended the excavation work.

“We see the light in our tunnel”

Stating that one of the historical days was experienced 204 meters below the ground, Minister Karaismailoğlu stated that the vehicle traffic increased with the revival of tourism in the region and the increase in trade. For a comfortable and safe journey, our construction works are continuing rapidly on the 10-kilometer Ayvacık-Küçükkuyu section of the north-south axis connecting Çanakkale to İzmir. We are constructing two double tube tunnels with a total length of 5 meters, which contain tens of sharp bends. We passed the final concrete pavement level in the 710-metre T-1.700 Tunnel. We see the light today in our 1-meter T-4.017 Tunnel.” said.

Stating that the Kaz Mountains ramps, which are located in the Ayvacık-Küçükkuyu section and can be passed in approximately 50 minutes, can be passed in as little as 5 minutes thanks to the tunnels, Minister Karaismailoğlu said that with the completion of the roads and tunnels, the safety of life and property in traffic will be ensured; will contribute to the tourism, trade and socio-economic development of the region; that the existing road will be shortened by 2,5 kilometers and reduced to 9,5 kilometers; thus, 72 million liras will be saved in one year, 8 million liras from time and 80 million liras from fuel; He also added that annual carbon emissions of 3 thousand 65 tons will be prevented.

Underlining the important contributions of the project to the region, Minister Karaismailoğlu said: “This project, which includes tunnels and roads, is extremely important as it will also strengthen the logistics highway infrastructure of Çanakkale and İzmir transportation. Çanakkale-İzmir and Çanakkale-Balıkesir roads will reach the divided road standard. The difficulties experienced in Kaz Mountains due to heavy traffic especially in summer and seasonal conditions in winter will be eliminated. The traffic quality and safety on the route will also increase significantly. Another importance of putting this line into service is; With the 1915 Çanakkale Bridge, it will also respond to the traffic density that will increase with the intercontinental highway connection.”

Minister Karaismailoğlu, emphasizing that giant steps have been taken that increase the transportation and communication investments that contribute to the competitiveness of our country and increase the quality of life of the society, said that the project value of the still ongoing highway investments in Çanakkale is over 4 billion 287 million liras, and that by increasing the quality of the highways, the region's production and He stated that they will continue to contribute to the development of trade, tourism and culture by increasing their employment.

After his speech, Minister Karaismailoğlu made the last hit of the excavation work with the construction machine at the excavation site.

Be the first to comment

Leave a response

Your email address will not be published.


*