Samsun Sarp Railway Project Shelved Trabzon Erzincan Railway In Program

samsun sarp railway project shelved trabzon erzincan railway is in the program
samsun sarp railway project shelved trabzon erzincan railway is in the program

From Samsun to Sarp Unfortunately, the Samsun-Sarp Railway Project, which the Black Sea was waiting for, was unfortunately shelved. Trabzon's Minister of Transport, Adil Karaismailoğlu, gave priority to the Trabzon-Erzincan Railway Project.

IT SHOULD HAVE BEEN DONE YEARS AGO

Salih Zeki Murzioğlu, President of Samsun Chamber of Commerce and Industry (STSO): Economic development, which is the common concern of the region, is achieved through such big projects. If this investment, which we believe must be implemented, had been put into operation simultaneously while the Black Sea Coastal Road was being built years ago, its cost would have been greatly reduced and the Black Sea economy would have been at a much different point.

THE COST IS NOT EXTRA CHEAP

Ordu Chamber of Commerce and Industry (OTSO) President Servet Şahin: If there is a Samsun-Sarp Railway, this line will connect to the Silk Road to China. In that respect, it is a very important project. It is a project that will make a significant contribution to the region. The cost is not exaggerated either. You maintain the railway once in 10 years, you maintain the highway once in 6 months. We are waiting for the project tender of Samsun Sarp line in the shortest time.

THE PROJECT OF 100 YEARS IS SAMSUN-SARP

Hasan Çakırmelikoğlu, President of Giresun Chamber of Commerce and Industry (GTSO): We are now in the age of communication and transportation. Samsun-Sarp is an appropriate and timely investment. A must have investment. An investment that will change the fortunes of the region. The highways of the region can no longer bear their load. Samsun-Sarp Railway Line is the biggest project of this region. It is the project of 100 years for the Black Sea Region.

IF THE BLACK SEA WILL BE RAILED SAMSUN-SARP

Rize Chamber of Commerce and Industry (RİTSO) President Şaban Aziz Karamehmetoğlu: I personally told this line to President Erdoğan. This needs to be included in the program now, a project tender has to be made. If a railway is to come to the Black Sea, its route should be Samsun-Sarp. When you connect this to Batumi, from there to Azerbaijan and from there to China, you connect to a world of 2,5 billion.

IT MUST BE IMPLEMENTED, NOT SHELF

Artvin Chamber of Commerce and Industry (ATSO) President Seçkin Kurt: Samsun-Sarp Railway will be very good for the Black Sea. Trade, tourism, transportation and everything will gain momentum. We expect our President to make the project tender for the Samsun-Sarp Line as soon as possible and bring it to the region. We will support this investment until the end.

WHAT HAPPENED TO THE SAMSUN-ORDU FAST TRAIN PROJECT?

Although it was announced that the project tender for the Samsun-Ordu Railway Line would be held on 25 December 2019, it was later canceled. After that, it has not been announced when the tender will be held again. It is wondered why the tender for the project was canceled and why it was not made after years.

Source: Army Incident

Be the first to comment

Leave a response

Your email address will not be published.


*