Tram Line Length in Kocaeli Will Reach 23,4 Kilometers

The length of the tram line in Kocaeli will reach kilometers
The length of the tram line in Kocaeli will reach kilometers

“We do not stop, we produce, we work uninterruptedly,” he said about the works carried out on the Yahyakaptan-Kuruçeşme tram line, which will increase the prestige of Izmit.

Marmara Municipalities Union and Kocaeli Metropolitan Municipality Mayor Assoc. Dr. Tahir Büyükakın examined the works carried out on the Yahyakaptan-Kuruçeşme tram line, which will increase the prestige of Izmit, on site. Accompanied by AK Party Kocaeli Provincial President Mehmet Ellibeş, AK Party Izmit District President Ali Güney, Metropolitan Municipality Deputy Secretary General Mustafa Altay and technical teams, President Büyükakın, who received information about the last point reached on the project, said: We are working with determination. We do not stop, we produce, we work uninterruptedly. Whatever our nation wants, whatever service it expects, we implement it. Here, with our tram line that we have extended to our Kuruçeşme Neighborhood, we will take another very important step in ensuring comfortable transportation for our citizens.” said.

“WE WILL RUN WITHOUT CLEANING FOR OUR PEOPLE”

Making a statement after the examination, Mayor Büyükakın said, “We are implementing transportation projects in every part of our city so that our citizens can have a better life on this service path that we set out by saying people first. The more we do, the more our nation sees the works we create, the more we witness smiles on their faces, the more our energy increases and we run more. We will keep running to produce for our people, and we will continue to strive to receive the blessings of our nation.”

“WE DID NOT WASTE YOUR TRUST, AND WE WILL NOT RELEASE THEM”

“As Kocaeli Metropolitan Municipality, we are preparing the city for the future,” said Mayor Büyükakın, “We are working to bring our city to a better place in terms of transportation with our transportation investments. We work on all our projects with a rational and scientific approach. We determine the roadmap with the demands of our citizens and the technical information in the field. We also have a busy schedule in order not to let the trust of our compatriots from Kocaeli in us fail. Thankfully, we have not failed the trust of our people so far, and we will not do so in the future," he said.

TRAM LINE WILL REACH 23,4 KILOMETERS

At the entrance to Kuruçeşme, the old bridges in front of the Gümüşhaneliler Foundation and in front of the İzmit High School will be demolished and two new steel construction pedestrian bridges will be built in their place. It will be manufactured as approximately 59 meters of steel construction. A new pedestrian bridge of 52 meters long steel construction will be built in front of Acıbadem pedestrian bridge and Izmit High School. A Transformer Center will be established to provide the energy of the line. In addition, a 1-meter steel bridge will be built to enable the tram to pass to Kuruçeşme. With the completion of the Kuruçeşme tram line, the length of the tram line will reach a double line of 330 thousand 10 meters. The single-line length of the tram will reach 212 kilometers, with a 3-kilometer single-line warehouse area. With Kuruçeşme station, the number of stops will reach 23,4 and with the new construction, 16 transformer centers will serve.

Be the first to comment

Leave a response

Your email address will not be published.


*