Kayseri Rail System Route is entrusted to Armin Elektrik

kayseri rail system guzergahi armin entrust to electric
kayseri rail system guzergahi armin entrust to electric

Kayseri 4th Stage Rail Transport System This project, which is considered as an extension of the Anafartalar-YHT Tram Line in the city, is a preferred rail system by taking advantage of the ease of transportation and urban width.

This system, which is planned to be built for a total of 15 km, is planned to be put into use in 2022 and put into active use by the public in 2023.

The Tramway business, purchased with the Kolin-Uzka partnership, is one of the works taken in the YHT-Tram Projects within Armin Elektrik.

It will be a structure that does not require high voltage such as YHT and Conventional lines, and therefore no return conductor will be used like other projects where the construction of grounding systems is undertaken.

Armin aims to sign the Tramway Project without any problems after a quality assembly depending on the existing equipment and team capacity.

Be the first to comment

Leave a response

Your email address will not be published.


*