Karamürsel Bridge Intersection Opened to Traffic

The caramel bridge intersection was opened to traffic
The caramel bridge intersection was opened to traffic

The project, which the people of Kocaeli are waiting for it to be completed, is completed. The Bridge Interchange built within the scope of the Karamürsel City Square and Crossroad Project was opened. The first to pass through the tunnel was Tahir Büyükakın, the Mayor of Kocaeli Metropolitan Municipality, sitting in the driver's seat.

ANOTHER PROJECT THAT BREATHES INTO THE CITY TRANSPORTATION

The Metropolitan Municipality offered one of the giant projects that will breathe urban transportation to the service of the citizens. Karamürsel City Square Bridge Junction, which connects the lower part and the upper part of Karamürsel's D-130 highway, was opened to vehicle traffic with a ceremony. The opening ceremony was attended by Metropolitan Mayor Tahir Büyükakın, Karamürsel District Governor Osman Aslan Canbaba, Karamürsel Mayor İsmail Yıldırım, AK Party Provincial Chairman Mehmet Ellibeş, MHP Provincial Chairman Aydın Ünlü, AK Party Karamürsel District Chairman Sait Mete, MHP Karamürsel District Chairman Çetin Öksüz, Municipality administrators , members of parliament and AK Party organization members.

"DREAM WAS REAL"

The Mayor of the Metropolitan Municipality Tahir Büyükakın and the accompanying delegation visited the sunken-output and then a statement was made. Stating that another dream has come true for Karamürsel, Mayor of Karamürsel İsmail Yıldırım said, “The sea side of Karamürsel and the region above D-130 have been connected to each other with this project. On behalf of the people of Karamürsel, I would like to thank our metropolitan mayor for completing this project ”.

"THE LAFA IS NOT LOOKED BY THE PERSON WHO IS THE RITUAL"

Karamürsel District Governor Osman Aslan Canbaba wished the new investment in Karamürsel to be beneficial. Providing detailed information about the project, Metropolitan Municipality Mayor Tahir Büyükakın said, “We are very happy that a new service has come to life. It is a ritual, one does not speak to one's words. Municipalities are places to do business, to produce services, not to make words.

"WE WILL CARRY THE TERMINAL"

The remaining side roads will be completed until the Ramadan feast. It became a tunnel with a closed area of ​​290 meters. Including VAT, a total investment of 85 million was made. Investments that governments could not make in the past are now made by our municipalities. Before coming here, we went to the terminal area with our mayor. By moving the terminal to a more suitable location, we want to make a project in this area that the city needs. In the first consultation we made with our mayor, it became prominent to use it for the need for parking space. However, we will shape this area by asking the people of Karamürsel.

EREĞLİ WILL END THE COAST

The opposition calls these investments we make investment in concrete. However, this is also an important investment in terms of reducing the carbon footprint. Those who are not willing to do business, who postpone not laying foundations, who are not a pebble, do not expect them to understand why they are made. Ereğli beach will end this summer. Our friends say it was like the Bodrum beach, but when I'm done, everyone will compare the other beaches to here, ”he said.

TRANSPORTATION TO COMFORT

With the completion of the works, intercity transportation will be relieved as well as urban traffic in Karamürsel, which is one of the important routes of intercity passenger and logistics transportation. Due to transit traffic, in the area where vehicle traffic was experienced at the center lights, they had to wait a long time at the lights. There were long queues at the entrances and exits of the city. As the transit traffic will be taken underground, it will be possible to enter and exit the Karamürsel center safely and quickly from the top.

SUNK-OUTPUT IS 290 METERS LENGTH

The tunnel of the sinkhole was built 19 meters wide and 290 meters long. Within the scope of the project, a total of 1600 meters of roads, including 900 meters double main road, 900 meters south, 2 meters north, and 310 side roads, 3 meters connection road, were built. Infrastructure lines have also been completely renewed.

803 BORED PILES PULLED

803 bored piles were driven in Karamürsel City Square Köprülü Crossroad, built by the Metropolitan Municipality. The tunnel, which has a 19 meters wide and 290 meters closed section, was covered with 348 prestressed beams.

Be the first to comment

Leave a response

Your email address will not be published.


*