Traffic Regulation in Bursa City Square!

Traffic Arrangement in Bursa City Square
Traffic Arrangement in Bursa City Square

Within the scope of the City Square-Terminal (T2 Line) Tram Construction Completion Works built by Bursa Metropolitan Municipality, the first stage of the T3 and T1 line integration works, which were planned in 2 stages, was completed. Within the scope of the crossing integration works of the second stage T1 and T2 lines, the works in the area connecting Kıbrıs Şehitleri Caddesi to Istanbul Street will be started as of March 09, 2021, and this section will be closed to vehicle traffic. T1 Line will not work during the works.

Drivers will be able to use the signalized lamps at the Kent Square intersection as an alternative route. Drivers must obey the speed limits in the city and navigate in a controlled manner, be careful and sensitive on the routes that are being studied, obey traffic signs and markers, and prefer alternative routes indicated with information signs.

Traffic Arrangement in Bursa City Square
Traffic Arrangement in Bursa City Square

Be the first to comment

Leave a response

Your email address will not be published.


*