Adana Osmaniye Gaziantep High Speed ​​Train Project Construction Works Full Speed

adana gaziantep high-speed train project construction work final face
adana gaziantep high-speed train project construction work final face

Gaziantep Governor Davut Gül and Gaziantep Metropolitan Mayor Fatma Şahin examined the construction site of the Adana Osmaniye Gaziantep high-speed train project, which will connect the Southeast of Nurdağı to the Mediterranean Region.

Gaziantep Governor Davut Gül and Gaziantep Metropolitan Municipality Mayor Fatma Şahin examined a series of visits and on-site works. Governor Gül and Mayor Şahin, who examined the tunnel between Nurdağı Bahçe in the high-speed train project, where the works on the Adana Osmaniye Gaziantep line were carried out at full speed, received information from the authorities about the latest situation.

The project includes 16 bridges, 84 culverts and 7 under / overpass structures. With the project, which will increase the operating speed from 60 km / h to 160 km / h, the travel times of freight trains will be reduced from 80 minutes to 15 minutes, and the travel times of passenger trains from 60 minutes to 10 minutes.

Be the first to comment

Leave a response

Your email address will not be published.


*