Kayseri Talas Homeland Tram Line Project Construction Work Tender Result

As a result of the tender for the construction of the talas homeland tram line
As a result of the tender for the construction of the talas homeland tram line

The tender for the 5.5-kilometer Talas Homeland Tram Line project to be built by the Kayseri Metropolitan Municipality was held with the participation of 6 companies.

The tender held in the Metropolitan Municipality Additional Service Building Meeting Hall was awarded to Yapıray Dem Sarayı İnşaat Sistemleri San. ve Tic. A.Ş., Gülermak Ağır San. Ins and Taah. A.S. and YDA İnş. Singing. Ve Tic. A.S. partnership, Kolin İnşaat Turizm Sanayi ve Tic. A.Ş., Unitek İnş. Singing. And. Tic. Aş. With Tur İnş. Hafr. Nak. Singing. Ve Tic. Ltd. Şti. partnership, Açilim Ins. Singing. Tic. Ltd. Şti. and Elron İnşaat Taah. Ve Tic. A.S. firms joined.

The commission chairman of the tender was Mehmet Duman, the Railway System Construction Branch Manager, while the commission members were civil engineer Mehmet Beydilli, civil engineer Naci Büyükbaş, Electrical Electronics Engineer Ahmet Yemlihalıoğlu and Financial Member Mustafa Kavi.

Tender Commission President Mehmet Duman, in his statement before the tender, said, “We are making a tender for a 5 kilometers long route to Talas Anayurt region in connection with the Kayseri Urban Rail System 5.52th Stage Study Şehit Furkan Doğan Station. We invited our companies to offer, companies made their offers. As of 30:14.00 on December 6, XNUMX companies submitted files. We will examine the files in terms of form, review the preliminary examination, offers and guarantees, and close the session to examine in detail. We will share the examination with the companies in writing. "Good luck to our winning company," he said.

Wishing the tender to be beneficial, Mayor of Kayseri Metropolitan Municipality Dr. Memduh Büyükkılıç said, “We offer more comfortable, safer and faster transportation to our citizens. As Kayseri Metropolitan Municipality, we made the tender of a new line from Talas to the Martyr Furkan Doğan Dormitory of 5.5 kilometers with the participation of 6 companies. With the implementation of the Talas-Furkan Doğan line along with the Belsin Anafartalar line, all parts of the city will be included in the transportation network with iron networks. With the commissioning of Belsin Anafartalar and Talas Anayurt projects, the rail system line will reach 48 kilometers. Good luck to our city already, ”he said.

1 GÜLERAK Agir San. Ins. and Taah. AS & YDA ins. Singing. Ve Tic. AS JV 15.142.577,97 EUR
2 YAPIRAY Railway Ins. Schist. Singing. ve Tic. 15.991.186,07 EUR
3  UNITEK Ins. Singing. ve Tic. AS & TUR Ins. Hafr. Nak. Singing. ve Tic. Ltd. Sti. JV 18.778.060,54 EUR
4 KOLIN Ins. Type. Singing. ve Tic. AS 18.924.150,00 EUR
5 ELRON Ins, Taah. ve Tic. AS 19.003.850,00 EUR
6 ACILIM Ins. Tic. and San. Ltd. Sti. 21.933.215,85 EUR
7 EMRE RAY Energy Ins. Singing. ve Tic. AS & SiGMA Ins. and Tour. ins. Tic. AS JE
8 KALYON Ins. Singing. ve Tic. AS
9 KYIVMETROBUD Public Joint Stock Company Conditionally
10 NUROL Ins. ve Tic. AS & OZALTIN ​​in ~. Tic. and San. AS JV

Kayseri Talas Homeland Tram Map

Tender of talas homeland tram line project was made
Tender of talas homeland tram line project was made

Be the first to comment

Leave a response

Your email address will not be published.


*