Another Tender for the Northern Marmara Motorway

Another Tender for the Northern Marmara Motorway
Another Tender for the Northern Marmara Motorway

The General Directorate of Highways is holding another tender for the Northern Marmara Motorway, which is built with the build-operate-transfer model for companies known to be close to the AKP.

The General Directorate of Highways, affiliated to the Ministry of Transport and Infrastructure, will hold a consultancy tender for the connection road of the Northern Marmara Motorway, which is built by the build-operate-transfer model and where millions of trees are cut.

According to the tender announcement in the Official Gazette, a tender will be held on 5 November for the construction period consultancy service of the Nakkaş-Başakşehir section of the Northern Marmara Motorway Project with the build-operate-transfer model. The temporary supply amount for the tender was announced as 1 million TL, while the sales price of the tender dossier was announced as 10 thousand TL.

To be Made Through Closed Offer

In the tender announcement, it was announced that the tender for the Northern Marmara Motorway Nakkaş-Başakşehir section will be held on November 05, at 14:30 at the Ministry of Transport and Infrastructure, General Directorate of Highways and among all bidders according to the "closed bidding procedure".

The tender for the Asian part (Kurtköy-Akyazı section) of the Northern Marmara Motorway Project, which includes the 3rd Bridge, which refers to the vibrant life of the entire Marmara, especially the northern forests of Istanbul, was awarded to the Limak-Cengiz Joint Venture Group and the European part. Kolin-Kalyon Joint Venture Group.

Daily 135 Thousand Vehicle Warranty

There is a daily guarantee of 135 thousand vehicles (49 million 275 thousand per year) for Yavuz Sultan Selim Bridge and Northern Ring Motorway. The toll is also calculated over 3 dollars + VAT. In addition, the companies operating the Yavuz Sultan Selim Bridge and the Northern Ring Motorway were paid 2019 billion 3 million lira for 50. (Source: Birgün)

Comment

  1. The Northern Marmara Highway means, it is being built to bring contractors to gain.
    Woe to those who wrote this!

Leave a response

Your email address will not be published.


*