Longest Tunnel of Ganzhou Shenzhen YHT Line Completed

Lorgnan Tunnel construction work, which is the longest tunnel on the line built for the high-speed train to run between Ganzhou and Shenzhen, was completed after 1.330 days.

Lorgnan Tunnel construction work, which is the longest tunnel on the line built for the high-speed train to run between Ganzhou and Shenzhen, was completed after 1.330 days. The 10,24-kilometer-long tunnel passes through many regions with very bad and difficult geological conditions and high risks in the framework of the studies. Therefore, the completion of the construction of this tunnel constitutes a very important step in the construction of the line.

The line connects Ganzhou city of Jiangxi province and Shenzhen city of Guangdong province and forms part of the Beijing-Hong Kong YHT line. There are a total of 436 stations on the 14-kilometer line. A high-speed train that can travel at a speed of 350 kilometers per hour will reduce the duration of the journey between these two cities, which was previously taken in seven hours, to two hours.

Hibya News Agency

Be the first to comment

Leave a response

Your email address will not be published.


*