Tender Result of the Improvement Work of Tunnel No. 3, Located Between Muratbağı Palu Stations

km of the tunnel located between yt line muratbagi palu stations
km of the tunnel located between yt line muratbagi palu stations

YT Line, between Muratbağı-Palu Stations, Rehabilitation of Tunnel No. 3 (km: 83 + 970-84 + 276) Tender Result

TC State Railways Enterprise TCDD 5th Region Purchasing Directorate (TCDD) YT Line, which is 2020/234038 KIK and has an approximate cost of 3.374.332,47 TL, is located between Muratbağı-Palu Stations, Number 3 Tunnel (km: 83 + 970-84 + 276) 93 firms submitted bids for the reclamation works tender and MİRZE MEHMET POLAT BEYMEN MÜH and MÜŞ won the tender with a bid of 2.178.378,75. 46 firms participating in the tender made a bid below the limit value.

The tender covers the rehabilitation works of Tunnel No.3 (km: 83 + 970-84 + 276), which is located between the YT Line, Muratbağı-Palu Stations. The duration of the work is 200 (two hundred) calendar days from the place delivery.

Be the first to comment

Leave a response

Your email address will not be published.


*