Works Start Again at Dudullu Bostancı Metro

Works on dudullu bostanci subway start again
Works on dudullu bostanci subway start again

İBB is activating another metro project whose construction has stopped. The works of Dudullu-Bostancı Metro, which is integrated with three rail system lines and sea transportation, will be held on Friday, July 10, by the President. Ekrem İmamoğluIt starts again with the ceremony to be held with the participation of .

Istanbul Metropolitan Municipality (IMM) is adding a new one to the metros that it has started to rebuild in Istanbul. After the Çekmeköy-Sancaktepe-Sultanbeyli, Ümraniye-Göztepe-Ataşehir and Kaynarca-Pendik-Tuzla metros, the construction of which was started again, the Dudullu-Bostancı line will be reactivated. will be performed. At the ceremony, IMM President Ekrem İmamoğlu, IMM bureaucrats and managers of contractor companies will take place.

The line, which was halted while there was 63 percent physical progress, consists of 13 stations. Maltepe, KadıköyWith the project that passes through Ataşehir and Ümraniye districts, 88 thousand 800 passengers will be able to travel per hour. The line, which will reduce Dudullu-Bostancı to 21 minutes, will be integrated with the following points:

  • Sea transportation at Bostancı station
  • Marmaray Line at Bostancı station
  • At Kozyatağı station Kadıköy-Kartal-Tavsantepe Line
  • Üsküdar-Ümraniye-Çekmeköy Line at Dudullu Station

The project, which will significantly ease the transportation of the Anatolian side, is aimed to be completed and put into service at the end of 2021.

Dudullu Bostanci Metro
Dudullu Bostanci Metro

Be the first to comment

Leave a response

Your email address will not be published.


*