TÜRK-İŞ President Atalay gave Date for National Electric Train

turk is general president atalay gave a date for the national electric train
turk is general president atalay gave a date for the national electric train

TÜRK-İŞ Chairman Ergün Atalay examined the national electric train set at TÜVASAŞ and gave the date that the train will hit the tracks.


After the aluminum body production workshop was opened in June 2019, it was announced that the first set of the National Electric Train, which was started in TÜVASAŞ, will be on the 29th of May. However, upon the last order from Ankara, it was reported that this ceremony was canceled and it was announced from the social media accounts of TÜVASAŞ that the ceremony was canceled. On these developments, Türk-İş Chairman Ergün Atalay examined the National Electric Train Set on site. President Atalay gave the good news that the train would be on the rails on October 29, by giving a date after the examination.

National Electricity Train Tracks on 29 October

TÜRK-İŞ Chairman Ergün Atalay said on 29 October that the train might be on the road. Atalay said, “I especially preferred to visit here. I have received information from my General Manager about Electric Train. Our desire is to make these trains that we have bought from other countries for years with our workers and industrialists in our country. Let those who run this country do it. Alhamdülillah we came to the end of the road 7 years ago. Our desire is the arrival of our Minister of Transport and Infrastructure within a short time, I think this train begins test drives in August, and this train will be on the roads on October 29. It is so important to us. I hope that we will make the first flight of this train to Istanbul with the participation of our President and all politicians and bureaucrats in the country. This train was made in TÜVASAŞ. Everyone, from the worker to the manager, has their labor. The national train was something we wouldn't believe if we had seen it in our dreams before, but alhamdulillah I had the opportunity to get on all the trains in the world, our national train that I traveled is missing from them and there is even more. Everyone will be happy when the national electric train set is put into service for our people. ”

National Electric Train Technical Specifications

Maximum Speed 160 km / h
Vehicle Body Aluminum
Rail Clearance 1435mm
Axle Load <18 tone
External Doors Electromechanical Door
Forehead Wall Doors Electromechanical Door
Boji Driven bogie and non-bogie bogie on every vehicle
Minimum Curve Radius 150 metres.
Clearance EN 15273-2 G1
Drive System AC / AC, IGBT / IGCT
Passenger Information PA / PIS, CCTV
Number of Passengers 322 + 2 PRM
Lighting system LED
Air Conditioning System EN 50125-1, T3 Class
Power source 25kV, 50 Hz
Outdoor Temperature 25 ° C / + 45 ° C
TSI Compliance TSI LOCErPAS - TSI PRM - TSI NOI
Number of Toilets Vacuum Type Toilet System 4 Standard + 1 Universal (PRM) Toilet
Draw Frame Automatic Coupling (Type 10) Semi Automatic Coupling



Be the first to comment

Comments