Mayor İmamoğlu Will Discard the First Source in İkitelli Ataköy Metro Line; The laying of the rails begins on the İkitelli-Ataköy Metro Line, one of the important rail systems of the European Side, whose construction has been accelerated. The first welding ceremony on the rails, İBB President Ekrem İmamoğlu and IMM Bureaucrats on Wednesday, May 20.
Istanbul Metropolitan Municipality (IMM) accelerated the work on the Ikitelli-Atakoy Metro Line, which was slowing down in the previous period. While tunnel excavations are continuing in the project, rail laying work is started in the completed tunnels.
First welding ceremony on the rails of the line, İBB President Ekrem İmamoğlu and IMM Bureaucrats on Wednesday, May 20. The ceremony, which will be held by going down to the tail tunnel of İkitelli Station of the existing Kirazlı-Olympic Stadium-Başakşehir Metro, will start at 11.00:XNUMX.
İkitelli-Ataköy Metro Line consisting of 13.5 km and 11 stations; Starting from İkitelli Industrial Station of the existing (M3) Başakşehir - Olympic - Kirazlı Metro Line, it ends at Ataköy Station by following a corridor parallel to Basın Ekspres Connection Road connecting the TEM and D100 Highway. The metro, which will take between İkitelli and Ataköy in 23 minutes, can carry 72 thousand passengers per hour.
The project will be integrated with a 5-rail system and a metrobus;
- At the İkitelli Station, (M3) Başakşehir - Olimpiyat - Kirazlı Metro Line's Olympic - İkitelli Industrial segment
- At Mehmet Akif Station, (M7) Kabataş - Mahmutbey - Esenyurt Metro
- Mimar Sinan Cad. (M1B) Yenikapı-Kirazlı - Halkalı Metro
- At Yenibosna Station, (M1A) Yenikapı-Atatürk Airport Metro Line and Metrobus
- Marmaray at Ataköy Station
Be the first to comment