Samsun Tram Times and Route Map

Samsun Tram Times and Route Map

Samsun Tram Times and Route Map

Samsun Light Rail System line, main line route 1st Stage Project starts from the University area and ends in the Gar station area. The main line length of the 10.10.2010st Stage Rail System line, which was put into service on 1, is 15.695 meters, the warehouse area is 1.900 meters and the inside of the workshop building is 404 meters long. Approximately 14 kilometers of the line is designed as a closed line and 1.5 kilometers as an open line. In the 1st Stage Rail System Line, there are 8 scissors that allow the passage of the rails and the change of direction of the trams in 74 regions in total. in total 42 All the details about Samsun Tram that serves with the number of stations in this article ...

Samsun Light Rail System

1.Etap Rail System Line has 21 passenger terminal. Pedestrian level crossings are available to ensure safe passage of pedestrians at all stations.

1. The 3 pieces of viaduct 5 pieces of pedestrian overpass are located on the main railway line. These overpasses; Yeni Mahalle- Atakent is located between Ömdensi-Türk-iş, Türk-iş-Mimarsinan, Atakum Municipality-Denizevleri, Denizevleri-Karayolları stations.

In 10.10.2016, Gar - Tekkeköy 2.Etap Rail System Line was opened and the service was started and 8 Panorama brand built in Bursa, the first domestic tram of our country was used in Samsun. With the 2.Etap Rail System Line, additional 15 stations were built and the Rail System line increased to approximately 29 km and the number of stations increased from 21 to 36. There are 2 overpasses on the 4.Etap Rail Line.

From 05.07.2019 to date, 6 is about 3 km long. Stage 19 May University Extension works on the Campus Line have been completed and started to serve with additional 7 stations.

Samsun Tram Stations

Samsun Tram Stations
Samsun Tram Stations

The rail systems (tram) route, which the people of Samsun use extensively, has been expanded. The number of stops increased to 42 after the opening of the OMU tram line, which has been expected for years.

  1. lodgings
  2. medical School
  3. Faculty of Dentistry
  4. Health Sciences
  5. Living Center
  6. Faculty of Education and Dormitories
  7. University
  8. Gulf
  9. Pelitköy
  10. Kurupelit
  11. New Neighborhood
  12. atakent
  13. Çobanlı
  14. the Ömürev
  15. Türkiş
  16. Architect Sinan
  17. Atakum Municipality
  18. Denizevleri
  19. highways
  20. Fine Arts
  21. Baruthane
  22. Fener
  23. Youth Park
  24. Port
  25. Big mosque
  26. Republic Square
  27. Gar
  28. In sword
  29. Samsunspor
  30. Belediyeevleri
  31. Blue Lights
  32. Fisher shelter
  33. Asarach
  34. Cherry
  35. Example Industry
  36. İlkadım Industry
  37. May 19 Industry
  38. Organized Industry
  39. Kerimbey
  40. Cumhuriyet
  41. Tekkekoy
  42. Stadium

Samsun Tram Fleet

Samsun has expanded its tram fleet twice, due to growing lines and increasing demand. 29 tram set (5 CRRC, 16 Ansaldo Breda, 8 Durmazlar)

Samsun Tram Schedule

Planned Dormitories - Tekkeköy Stations mutual departure times for trams are as follows. Changes may occur in departure times and expedition intervals due to passenger density, traffic density and technical failures.

Time range medical School
Rectorate
Rectorate
Belediyeevleri
Belediyeevleri
Tekkekoy
06:15 06:45 12 Minute 6 Minute 12 Minute
06:45 09:00 10 Minute 5 Minute 10 Minute
09:00 20:00 12 Minute 6 Minute 12 Minute
20:00 21:00 20 Minute 10 Minute 20 Minute
21:00 23:45 30 Minute 15 Minute 30 Minute

Reciprocal last flights from University and Tekkeköy Stations 23:45It is.

Public Holidays, Exam etc. times and departure times may vary.

Samsun Tram Charges

The fare system of the tram is as follows.

Boarding Type 1-12 Bus Stop 1-24 Bus Stop 1-30 Bus Stop 1-42 Bus Stop
Full Price 2,20 TL 2,50 TL 3,50 TL 4,00 TL
Samkart Education 1,85 TL 2,00 TL 2,60 TL 3,00 TL
Ring Transfer Fee 0,65 TL
Full Samkart Ultralight card
            7,00 TL             9,00 TL
University Travel
Full Samkart 0,75 TL Samkart Education 0,50 TL

Map of Samsun Tram

Be the first to comment

Leave a response

Your email address will not be published.


*