Samsun Tram Times and Route Map

samsun tram times and route map
samsun tram times and route map

Samsun Light Rail System line, main line route 1.Etap Project starts in the university area and ends in Gar station area. 10.10.2010 was put into service in 1. The main line length of the Stage Rail System line is 15.695 meters, the storage area is 1.900 meters and the workshop building is 404 meters long. 14 kilometers of the line is closed and 1.5 kilometers are designed as open lines. There are 1 scissors in the 8 area on the 74.

Samsun Light Rail System

1.Etap Rail System Line has 21 passenger terminal. Pedestrian level crossings are available to ensure safe passage of pedestrians at all stations.

1. The 3 pieces of viaduct 5 pieces of pedestrian overpass are located on the main railway line. These overpasses; Yeni Mahalle- Atakent is located between Ömdensi-Türk-iş, Türk-iş-Mimarsinan, Atakum Municipality-Denizevleri, Denizevleri-Karayolları stations.

In 10.10.2016, Gar - Tekkeköy 2.Etap Rail System Line was opened and the service was started and 8 Panorama brand built in Bursa, the first domestic tram of our country was used in Samsun. With the 2.Etap Rail System Line, additional 15 stations were built and the Rail System line increased to approximately 29 km and the number of stations increased from 21 to 36. There are 2 overpasses on the 4.Etap Rail Line.

From 05.07.2019 to date, 6 is about 3 km long. Stage 19 May University Extension works on the Campus Line have been completed and started to serve with additional 7 stations.

Samsun Tram Stations

Samsun Tram Stations
Samsun Tram Stations

The rail system (tram), which is widely used by the people of Samsun, was expanded. Following the opening of the long-awaited OMÜ tram line, the number of stops has increased to 42.

• Lodgings
•Medical School
•Faculty of Dentistry
•Health Sciences
• Life Center
• Faculty of Education and Dormitories
•University
•Gulf
• Pelitköy
• Kurupelit
• New Neighborhood
• Atakent
• Çobanlı
• The Ömürev
• Türkiş
• Architect Sinan
• Municipality of Atakum
• Denizevleri
• Highways
•Fine Arts
• Baruthane
•Lantern
• Youth Park
•Port
•Big mosque
• Republic Square
•Station
• Kılıçdede
• Samsunspor
• Belediyeevleri
• Blue Lights
•Fisher shelter
• Asarağaç
• Kirazlık
• Sample Industry
• İlkadım Industry
• 19 May Industry
• Organized Industry
• Kerimbey
•Republic
• Tekkekoy
•Stadium

Samsun Tram Fleet

Samsun has expanded its tram fleet twice, due to growing lines and increasing demand. 29 tram set (5 CRRC, 16 Ansaldo Breda, 8 Durmazlar)

Samsun Tram Schedule

Scheduled Dormitories - Tekkeköy Stations of the trams are as follows.

Movement Hours are updated.

... ..

Changes in departure times and voyage intervals may occur due to passenger density, traffic density and technical failures.
The last reciprocal flights from University and Tekkeköy Stations are 23: 45.
Public Holidays, Exam etc. times and departure times may vary.

Samsun Tram Charges

The fare system of the tram is as follows.

Boarding Type 1-12 Bus Stop 1-24 Bus Stop 1-30 Bus Stop 1-42 Bus Stop
Full Price 2,20 TL 2,50 TL 3,50 TL 4,00 TL
Samkart Education 1,85 TL 2,00 TL 2,60 TL 3,00 TL
Ring Transfer Fee 0,65 TL
Full Samkart Ultralight card
7,00 TL 9,00 TL
University Travel
Full Samkart 0,75 TL Samkart Education 0,50 TL

Map of Samsun Tram

Railway News Search

Be the first to comment

Comments