Attention! .. Traffic Flow on Mürselpaşa Boulevard is Changing

izmirliler attention murselpasa boulevard is changing traffic flow
izmirliler attention murselpasa boulevard is changing traffic flow

As Çiğli Waste Water Treatment Plant will be cleaned in the portion of the collector line that carries domestic wastewater passing through Mürselpaşa Boulevard, the exit section of Yeşildere Street to Basmane direction will be closed to traffic as of September.

İzmir Metropolitan Municipality General Directorate of İZSU is taking care of 6,2 kilometer collector line carrying domestic waste water between Customs and Bayraklı pumping stations. Mürselpaşa Boulevard, due to the cleaning work to be done in the part of the traffic flow will be made changes.

According to the decision taken by Izmir Metropolitan Municipality Transportation Coordination Center (UKOME), the section of Mürselpaşa Boulevard from Yeşildere Street to Dokuz Eylül Square will be closed to traffic at 23 September 2019 Monday at 10.30. The cleaning work will be carried out in the 2 2,2 meter diameter collector line. Within the scope of the 20 day-long activities, vehicles that want to go to Yeşildere to Dokuz Eylül Square (Basmane) will follow the route from the İzmir Metropolitan Municipality Vocational Factory (Former State DGM Building) to the port instead. Bornova from Dokuz Eylül Square /Karşıyaka vehicles that want to go to the direction of traffic in the opposite direction will use the road closed.

izmirliler attention murselpasa boulevard is changing traffic flow
izmirliler attention murselpasa boulevard is changing traffic flow
About Levent Elmastaş
RayHaber editor

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.