
Kocaeli Metropolitan Municipality, which enables pedestrians to move comfortably as well as vehicles in traffic, has created new and modern pedestrian overpasses to the city. kazancontinues to climb. The Çetin Emeç Overpass, located in the Yenidogan District of the Izmit district, is being removed by the Metropolitan Municipality, as it is old and does not meet the needs. As part of the works, the main body assembly of the new steel overpass was done last night. With the devoted work of the teams, the main body was placed and assembled overnight without any problems.
THE MAIN BODY IS PLACED ON THE LEGS
The team of the Metropolitan Municipality Department of Science Affairs, who made the construction of the new overpass, which will change the face of the region with its modern appearance, had already completed the basic productions, foot and stair column assemblies. Metropolitan teams continued their work rapidly, the assembly of the main body prepared as a whole in the factory D-100 Road traffic was less than last night.
95 TON STEEL USED
The new Çetin Emeç Overpass was built 39 meters long. 80 tons of steel, 15 tons of reinforcing steel and 115 cubic meters of concrete are used for overpass production. 33 square meter composite covering, 192 square meter half cover facade covering, 4 security camera, 19 lighting fixture manufacturing and electrical infrastructure works will be done for elevator and electrical productions.
ELEVATOR AND RUNWAY MANUFACTURING
Metropolitan Municipality teams that perform the assembly of the main body, the overpass of the stairs, made of non-slip rubber tartan runway floor and railing will do. In the new modern overpass, two elevators will serve the citizens. The Metropolitan Municipality will keep the existing overpass bridge open until the opening of the new bridge to prevent citizens from crossing the street.
Be the first to comment