Tuzla Çayırova Transportation Project

work on the project to relieve the transportation of salt and cayirova
work on the project to relieve the transportation of salt and cayirova

Kocaeli Metropolitan Municipality continues to implement various projects in order to provide easy and comfortable transportation to every point of the city. New roads accelerate the flow of traffic, as an alternative transportation route provides convenience to citizens. In this direction, the connection road to Çayırova will be easy to connect with Istanbul. The connection road between Tuzla-Şifa Neighborhood and Çayırova will facilitate the transportation between the two regions. The project is currently undergoing excavation and filling of the bridge connection roads.

EXCAVATION AND FILLING OF BRIDGE CONNECTION ROADS
In the project which is still in the process of implementation, all leg and beam manufacturing of the bridge was completed. The deck bridge of the connection bridge was poured. Excavation and backfilling of bridge connection roads are currently underway. After the excavation and filling works, the production of stormwater and drinking water lines of the connection roads will be realized.

TRANSPORTATION ISSUE WILL REMOVE
Transportation problem between Şifa Mahallesi - Çayırova, which does not have a direct connection to Şekerpınar connection road E-80, will be eliminated thanks to the connection roads. The residents of Şifa Mahallesi, who can reach Şekerpınar connection road via Çiftlik Street, will provide easy access to Çayırova direction after the completion of the project.

TWO ZONES CONNECT TO Each Other
The project will be connected to the E-80 to provide both east-west and north-south traffic flow. The bridge and connecting roads to be built in the southern part of the truck park in the neighborhood will connect the two regions. Within the scope of the project, 1 91 and a half meter 7 meter wide and 90 meter 11 meter wide bridge are being constructed.

11 THOUSAND 725 TON ASPHALT SERIES
Within the scope of the project, 2 bin 500 meter road will be manufactured. In the study 4 thousand 615 cubic meters concrete, 675 tons of iron, thousand 429 meters stormwater sewer line, 597 meters will be made of drinking water line. 852 meter piles will be manufactured for bridges. 5 bin 600 square meters parquet flooring, 10 bin 150 meter curb to be laid. 11 bin 725 tone asphalt material to be used on the roads.