Varsak Bus Station Tram Line put into service

bus station tram line commenced service
bus station tram line commenced service

Antalya Metropolitan Municipality, 3 after the completion of tests. 11 has started its passenger flights on the Varsak-Otogar route since August. The 3. With the Stage Rail System Line, it can travel from Varsak to the bus station, city center, Aksu and Airport.

Metropolitan Municipality, 3 Rail System Transportation network. With the Stage Rail system line, 46.5 has increased its mileage. 3 opened before the completion of tests before the elections. The Stage Rail System Project was halted as soon as the elections were carried out by the contractor as of the date of 01.04.2019 in order to carry out the required technical tests. In this process, 28 has undergone separate 3 tests in order to ensure the safety of citizens' lives and property in the best way. 11 officially started to carry passengers between Varsak-Otogar in August. The 3. With the Stage Rail System Line, it can travel from Varsak to the bus station, city center, Aksu and Airport. Passengers do not pay any fees for transfers within 1 hours.

FREE RING FOR 1.ETAP RAIL SYSTEM

06.00, which starts the first time from the station at the 3. Stage Rail System vehicles reach to Atatürk station which is the last stop before the Bus Station via Sakarya Boulevard. Passengers can use the free bus service from the bus station and 1. Moves to the Battery Factory Station on the Etap Rail System Line. 1 is a passenger who takes the tram from the line. Transferring to the Stage Rail System Line, it can travel comfortably to the city center, airport or Aksu / Expo. 3. Stage Rail System Line makes its last flight from Ataturk station at 23.16.

Antalya rail system map
Antalya rail system map

Be the first to comment

Leave a response

Your email address will not be published.


*