Antalya Tram Times, Route and Price Schedule 2019

antalya tram times guzergahi and fare schedule
antalya tram times guzergahi and fare schedule

2010 was put into service in Antalya by the Metropolitan Municipality of Antalya. Etap Light Rail line starts from Fatih area and ends at Meydan station area. Line about 1 km. and there are 11 passenger stations. All stations have pedestrian level crossings to ensure pedestrian crossing safely.

In 2016, 2.Etap Rail System Line, which connects the existing line to Expo and Airport, has been opened and started to serve. With the 2.Etap Rail System Line, additional 15 stations were built and the Rail System line increased to approximately 30 km and the number of stations increased to 31. 3. Stage Rail System Varsak-Otogar Line sand bag trial runs started. After the completion of the safety tests, the passenger flights on the Varsak-Otogar line will begin.

Fatih - Meydan - Airport times Click here

Airport - Square - Fatih times Click here

Fatih - Meydan - Expo times Click here

For Expo - Meydan - Fatih schedule Click here

The tram consists of two important lines. 1. Airport Line; It starts at Fatih Station and ends at Antalya Airport stop. Other 2.Expo line; starts at Fatih stop and ends at Expo stop. The Airport Line and Expo Line routes are the same until the Airport Junction. Airport Tram to the airport after the clover junction stop. The other line ends at the Expo stop on the way to Aksu. Below you will find Tram Route and Station information.

Airport Tram Line Stations;
1. CONQUEROR,
2. Kepezaltı,
3. FERROKROM,
4. FOUNDATION FARM,
5. BUS STATION,
6. BATTERY FACTORY,
7. WEAVING,
8. ÇALLI,
9. SAFETY,
10. INSURANCE,
11. STOCKADE,
12. MURATPAŞA,
13. İSMETPAŞA,
14. EAST GARAGE,
15.BURHANETTİN ONAT,
16. SQUARE,
17. BARRACKS,
18. TOPÇULAR,
19. DEMOCRACY,
20. CIRNIK,
21. ALTINOVA,
22. YENİGÖL,
23. SINAN,
24. Clover intersection,
25. ANTALYA AIRPORT.


Expo Tram Line Stations;
1. CONQUEROR
2. Kepezaltı
3. I FERROKROM
4. FOUNDATION FARM
5. BUS STATION
6. BATTERY FACTORY
7. WEAVING
8. ÇALLI
9. SAFETY
10. INSURANCE
11. STOCKADE
12. MURATPAŞA
13. İSMETPAŞA
14. EAST GARAGE
15.BURHANETTİN ONAT
16. SQUARE
17. BARRACKS
18. TOPÇULAR
19. DEMOCRACY
20. CIRNIK
21. ALTINOVA
22. YENİGÖL
23. SİNAN
24. Clover Junction
25. PINAR ANFAS
26. LEADED
27. DION
28. EXPO

Otogar Varsak Tram Line Stations

1.ATATÜRK
2.ZAF is
3.YILDIRIM BEYAZIT
4.ERDEM BEYAZIT KM
5.THE MARTYRS PARK
6.KEPEZ MUNICIPALITY
to 7.YEŞİLIR
I 8.GÜNDOĞ
9.SÜTÇÜ on
the 10.GAZ
11.KUZEYKA to
12.FEVZİ ÇAKMAK
13.ULUBATLI HASAN
Contact Suleyman directly
15.ŞELAL to
16.KARŞIYAK to
17.AYDOĞ have
18.AKTOPRAK
19.KEPEZPARK
If 20.V
21.VARSAK WAREHOUSE AREA
22.VARSAK Bus Station

With Antalya Airport Tram Line; Very convenient and easy way from the bus station and the city center to Antalya Airport Domestic Terminal and 1. Access to the International Terminal (T1) is provided.

Antalya Airport Tram (Antray) stop Domestic Terminal and 1. It is directly opposite the International Terminal. Tram 2. It does not go to the International Terminal (T2). Tram tickets are available from Automatic machines.

Antalya Tram Fee:

After the evaluation made by Antalya Metropolitan Municipality Transportation Coordination Center, price adjustment was made on 15.08.2019 for public transportation fees.

Antalya Metropolitan Municipality Public Transportation card (Antalya card) and Credit Card with Contactless Feature

Full: 3,20 TL - Teacher and Retired: 2,70 TL - Student: 1,80 TL Not for cash. (You can buy tickets at the ticket offices at the tram stops. You can also refill and buy tickets from automatic ticket machines.)
You can use your contactless credit cards for boarding the trams.

60 Transfer for Minutes Free

Previously, 1 TL is charged at the transfer, while the new transportation tariff is free for the 60 minutes. With the removal of the transfer fee, a discount was provided on the ticket prices of the citizens making the transfer. In the current application, 2,60 TL + 1,00 TL pays a total of 3,60 TL together with full ticket transfer, while the new arrangement now only pays 3,20 TL. With the revision of the lines, the transfers will increase. In this way, public transportation is intended to become a transportation option that citizens will prefer more.

Antalya tram map
Antalya tram map

Current Railway Tender Schedule

For 19

Tender Notice: Spring Clamp Purchase

September 19 @ 10: 00 - 11:00
Organizer: TCDD
444 8 233
How 20
How 20
Salt 24

Tender Notice: Horizontal Life Line Will Be Purchased (TUDEMSAS)

September 24 @ 14: 00 - 15:00
Organizer: TÜDEMSAŞ
+90 346 2251818
Tsar 25

Announcement of Tender: Elevator Electro-Mechanical Works

September 25 @ 10: 00 - 11:00
Organizer: TCDD
444 8 233
About Levent Elmastaş
RayHaber editor

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.