Afyon-Karakuyu Line Retaining Wall Demolition and Splitting

opium black line line between the breakdown of the retaining wall to be torn down
opium black line line between the breakdown of the retaining wall to be torn down

Afyon-Karakuyu Line Km: 35 + 920-36 + 250 Between Retaining Wall Demolition and Splitting

Turkish State Railways. Regional Purchasing Directorate (TCDD) 7 / 2019 limit value 248779 TL and the approximate cost of 555.437 TLAfyon-Karakuyu Line Km: 814.493,84 + 35-920 + 36 Between the Retaining Wall Breaking the Retaining Wall between the 250 and 49 OZER CONSTRUCTION CONTRACT TRADE TOUR LTD. The 557.955,85 company, which participated in the tender, submitted a bid below the limit value.

The tender covers 41275,21 m3 excavation, 396 m3 concrete, 1012,5 m3 retaining wall demolition, 0,33 km volume calculation. The duration of the work is 100 (one hundred) calendar days from the place delivery.

Current Railway Tender Schedule

Salt 24

Tender Notice: Horizontal Life Line Will Be Purchased (TUDEMSAS)

September 24 @ 14: 00 - 15:00
Organizer: TÜDEMSAŞ
+90 346 2251818
Tsar 25

Announcement of Tender: Elevator Electro-Mechanical Works

September 25 @ 10: 00 - 11:00
Organizer: TCDD
444 8 233
Tsar 25
Oct 01

Procurement Notice: Independent Audit Service Will Be Obtained

October 1 @ 10: 00 - 11:00
Organizer: TCDD
444 8 233
About Levent Elmastaş
RayHaber editor

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.