Work at the Second Airport to the Sea Full Gas Driving

work at the second airport to the sea is full throttle
work at the second airport to the sea is full throttle

Transport and Infrastructure Minister Cahit Turhan, sea built on the fill method is that Turkey will be the second airport in Rize and Artvin Airport is the most important part of the completion of the xnumx's percent of the rubble mound breakwater in nature, said: "When the entire airport infrastructure construction is considered, so the project 56 more than completed. '

Minister Turhan, based on the work at Rize-Artvin Airport 2017'da evaluated.

Airport Rize center 34, Artvin 125, Hopa 54 kilometers away, Stephano and Sunday reminded that made the coastal locality Turhan, here is the sea on then Airport Ordu-Giresun built by the method of filling said Turkey would be the second airport of that nature .

Turhan, Turkey's airport will be one of the agenda of the region for many years and huge investment is expected to forward emphasizing that, he told us that this place is an important work to do in order to guard against the tempestuous waves of the Black Sea.

Turhan, which attracted attention to the stone filling of more than 85,5 million tons to the sea, expressed that the project was difficult.

Turhan stated that the opening date of Rize-Artvin Airport was determined as 2022 but it was planned to be put into service at the end of 2020.

Ulaşım Air transportation in the Eastern Black Sea will be ensured without interruption “

Turhan stated that the airport will contribute to the development of the districts with tourism potential of Rize and Artvin and also increase the commercial relations with the neighboring countries of the Eastern Black Sea Region. said he would provide.

Turhan stated that 242 thousand tons of stone filling was done in the project with 100 heavy duty machines at the moment and said:

I 25 million tons of stone filling was completed in May. 10,5 million tons of it is categorical stone called stone to be used in the construction of the direct sea. Sea on Turkey's second airport will be built with fill method Rize-Artvin xnumx's percent of the rubble mound breakwater was completed in the most important parts of qualifications at the airport. Considering the construction of airport infrastructure facilities, more than 56 of the project is completed. Havalimanı

The terminal building with an indoor area of ​​approximately 45 thousand square meters, will be made in a way to serve the annual 3 million passengers.

Current Railway Tenders

Mon 09

Gulf Traffic

Range 9 @ 08: 00 - Range 11 @ 17: 00

Railway News Search

Be the first to comment

Comments