Kocaeli Metropolitan Municipality will build an underpass where the tram line can pass to Izmit Mevlana Junction so that the tram line can reach Kuruçeşme area. Within this scope, traffic arrangements will be made for the works to be done in the region as of the weekend. The arrangements will take place at certain intervals after 29 on Saturday in June.
NEW TRAFFIC ARRANGEMENT
The subway will be built by Kocaeli Metropolitan Municipality in the part of Akçaray Tram Line that will be extended to Kuruçeşme region. The subway will be built under Mevlana Junction on Izmit D - 100 Highway. Within the scope of the studies to be made in the region, a new traffic regulation was made.
TRAFFIC ARRANGEMENT ON TWO STREETS
Providing the connection of the Kuruçeşme Beach Line, Mevlana Junction will be closed to traffic and the branch that connects Revolution Street to Highway Street and the branch that connects to Salim Dervişoğlu Street will be closed to traffic.
A PART OF THE KASVAG IS OPEN TO TRAFFIC
During the study, traffic from Kuruçeşme İnkılap Street will be transferred to Highway Street D-100 connection road. Drivers who want to go to Kuruçeşme from D100 connection road and Plajyolu Highway Avenue will be able to use Mevlana Junction's Revolution Street connection.
TRANSITION TO THE BEACH
Kuruçeşme line and D-100 highway to the beach by the Seka State Hospital Bridge to the drivers who want to go to the Beach Road.