Current Marmaray Expedition Times and Fees

marmaray expedition times
marmaray schedules and schedules

Current Marmaray Expedition Times and Fees are as follows.

The trains that will run between MARMARAY GEBZE - HALKALI and SÖGÜTLÜÇEŞME - ZEYTİNBURNU are as follows:

  • Gebze Halkalı once every 15 minute
  • Sogutlucesme Zeytinburnu every 8 once a minute

Marmaray Fees

FULL DISCOUNT
Minimum Transportation Fee ₺2,60 ₺1,25 ₺1,85
FULL TRACK FEE ₺5,70 ₺2,75 ₺4,00
pAUSE is FULL DISCOUNT DISCOUNT-2
1 - 7 STATION ₺2,60 ₺1,25 ₺1,85
8- 14 STATION ₺3,25 ₺1,55 ₺2,30
15 - 21 STATION ₺3,80 ₺1,80 ₺2,70
22 - 28 STATION ₺4,40 ₺2,10 ₺3,15
29 - 35 STATION ₺5,20 ₺2,50 ₺3,70
36 - 43 STATION ₺5,70 ₺2,75 ₺4,00
pAUSE is MONTHLY LIMITED MARMARAY
subscription TICKET CORPORATE TICKETS
1 - 7 STATION 1 3 1
8- 14 STATION 2 3 1
15 - 21 STATION 2 3 1
22 - 28 STATION 3 3 1
29 - 35 STATION 3 3 1
36 - 43 STATION 4 3 1

% Passengers with disabilities over 40 can travel free of charge with the cards they will receive from the Ministry of Family and Social Policies, and passengers over the age of 65 can use their ID cards free of charge.

  • No transfer, no transfer,
  • No refunds can be made at the same station,
  • If an Istanbulcard is used for more than one person, only one refund shall be made,
  • The common subscription (Blue Card) used in Istanbul is valid.

Map of Marmaray and Gebze Halkalı Marmaray Stops and Schedule: Marmaray, the project connecting the European and Asian sides of Istanbul Halkalı You can find all information about the stops and times of the Gebze subway in this content. Halkalı - Gebze suburban line 2019 covers renewed lines within the scope of Marmaray project. Located on the European Side Halkalıand starts to Gebze.

You can easily share this map on social media by adding html code to your site.

On the European Side Halkalı and Kazlıçeşme provides transportation between Marmaray and the Anatolian side of the city.

The people of Istanbul know very well that the first step of this project was taken by the Kazlıçeşme - Ayrılık Fountain, which connects the Anatolian side with the European side.

Halkalı - Gebze Metro Stations

It has the largest longest metro route in Istanbul Halkalı - There is a total of 42 stops in Gebze metro line. 14 is located on the European side and the remaining 28 is on the Asian side.

  1. Halkalı
  2. Mustafa Kemal
  3. Kucukcekmece
  4. Florya
  5. Yesilköy
  6. Yesilyurt
  7. Atakoy
  8. Bakirkoy
  9. Yenimahalle
  10. Zeytinburnu
  11. Kazlıçeşme
  12. Yenikapı
  13. Sirkeci
  14. Bosphorus
  15. Uskudar
  16. İbrahimağa
  17. Sogutlucesme
  18. Feneryolu
  19. Göztepe
  20. Erenköy
  21. Suadiye
  22. Bostanci
  23. Küçükyalı
  24. İdealtepe
  25. Sureyya Beach
  26. Maltepe
  27. Cevizli
  28. Atalar
  29. Basak
  30. Kartal
  31. Yunus
  32. Pendik
  33. Kaynarca
  34. Tersane
  35. Güzelyali
  36. Aydıntepe
  37. İçmeler
  38. Tuzla
  39. Çayırova
  40. Fatih
  41. Osmangazi
  42. Gebze

Halkali gebze metro

Halkalı - Gebze Metro Line Hours

marmaray expedition times
marmaray expedition times

Halkalı - Gebze Metro

Halkalı - As mentioned above, there is a stop at 42 in Gebze subway. Halkalı and the total time between Gebze stops will go down to 115 minutes. Briefly Halkalı115 minutes in 1 hours in 55 hours will be in Gebze.

Halkali gebze metro

Halkalı - Gebze Metro Transfer Stops

Halkalı There are many transfer stops on the Gebze Metro line. Halkalı - You can see the metro lines that you will transfer via Gebze metro line.

Gebze Halkalı Transfer stops on the Metro Line Metro

When the entire line is opened for operation;

  • Halkalı at the station M1B Yenikapı-Halkalı with metro line,
  • At Ataköy station with M9 İkitelli-Ataköy metro line,
  • At the Bakirkoy station with the M3 Bakırköy-Başakşehir metro line,
  • Yenikapı-Atatürk Airport at Yenikapı station, M1A
  • Yenikapı-Kirazlı and M1 Yenikapı-Hacıosman metro lines at Yenikapı Station
  • T1 Kabataş-Bağcılar tram line and seaways at Sirkeci station,
  • At the Ayrılık Fountain station M4 Kadıköy-Tuzla metro line,
  • In Üsküdar station M5 Üsküdar-Çekmeköy metro line,
  • At Göztepe station with M12 Göztepe-Ümraniye metro line,
  • In Bostancı station with M8 Bostancı-Dudullu metro line,
  • Pendik-Sabiha Gokcen Airport metro line at Pendik station
  • İçmeler M4 will be integrated with Kadıköy-Tuzla metro line.

Halkalı When to Open Gebze Metro Line?

One of the most curious issues of citizens Halkalı - When to open Gebze Metro line -

The Minister of Transport and Infrastructure Cahit Turhan said in a statement that Bakanı Gebze-Halkalı railway line, 12 will be launched in March. All the infrastructure and stations were rebuilt within the scope of the project which will reduce the distance between the two lines from 185 to 115 minutes.

Halkalı - Gebze Metro and YHT Ankara Connection

2019 expected to end completely within the year Halkalı The Gebze metro line will be completed by YHT Ankara connection. So, a traveler who departed from Ankara, Gebze, Pendik, Maltepe, Bostancı, Söğütlüçeşme, Bakırköy and Halkalıwill stop in.

About Levent Ozen
Every year, high-speed rail sector, the European leader in the growing Turkey. Investments in railways, which take this speed from high-speed trains, continue to increase. In addition, with the investments made for transportation in the city, the stars of many of our companies making domestic production shine. It is proud that Turkish high-speed tren national train ”production has been started in addition to the companies producing domestic tram, light rail and subway vehicles. We are very happy to be in this proud table.

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.