EIA Process for Extending Akçaray to 3 Separate Region Completed

ced process for the extension of akcarayin separate region completed
ced process for the extension of akcarayin separate region completed

The EIA process was completed to extend the tram in Izmit city center to the 3 separate region. It was decided that “EIA is not required ilgili. New lines to be built with an estimated cost of 393 million pounds Kuruçeşme, city hospital and Kocaeli Stadium will go up. 23 new stops on line

Kocaeli Barış NewspaperAccording to the news of Uğur Enç; “When Ibrahim Karaosmanoglu, the former mayor of Kocaeli Metropolitan Municipality, promised tram to our city, the year was 2009. Karaosmanoğlu, who could not build the tram until 5, was one of the projects he said “I will do it in 2017 within the year, and showed a great example of inexperience by illuminating the tram model he brought to İzmit Anıtpark with an 3 socket. Good and bad tram project was implemented. There was a significant improvement in the tram, which citizens began to use with the 8 year delay. 30 In May, Kocaeli Metropolitan Municipality started the EIA process for the new 3 line to be added to the tram.

393 MILLION LIRA
Ayaz Environmental Engineering firm applied to the Provincial Directorate of Environment and Urbanism Kocaeli Metropolitan Municipality, Sekapark-Kuruçeşme, Yahyakaptan-Alikahya, Mehmet Ali Pasha-City Hospital for the construction of 393 million pounds said that the construction of the budget. The budgets allocated for 23 new line to be built on 3 new stop are as follows; Sekapark-Kuruçeşme 61 million 500 thousand, Mehmet Ali Pasha-City Hospital 235 million 500 thousand, Yahyakaptan-Alikahya 96 million pounds.

EIA NOT REQUIRED
The municipality added the decision of the existing line “EIA is not required için for the 23 separate line which will serve with total 3 new stops to the application file. The Provincial Directorate of Environment and Urbanization, which will examine the documents, was expected to make the decision “no EIA required için for the 3 additional line as it is for the existing line. It was to be expected. Kocaeli Provincial Directorate of Environment and Urbanization has decided that no EIA is required for the project.

The stops of the new lines will be as follows

SEKAPARK-KURUCEŞME LINE
Seka State Hospital, Congress Center, Education Campus, Beach Road, Kurucesme,

MEHMET ALİ PAŞA-ŞEHİR HOSPITAL LINE
2 units on Kanalboyu, Turan Güneş Street, Başaran, FTR, City Hospital,

YAHYAKAPTAN-ALIKAHYA LINE
Recep Topaloglu, Akasyalar, Yahya Kaptan, School District, Kentsa Sitesi, Sabanci Vocational High School, 2 units in Alikahya Fatih, Alikahya Center, Independence, Stadium

BILLINGS

Similar Railway News

Similar High Speed ​​Train News

Be the first to comment

Comments

This site uses Akismet to reduce spam. Learn how your comment is processed.